Kerb height, falls and keeping lantern glass clear of standing water

How kerb height and roof fall decide whether a roof lantern stands clear of standing water, where the 150mm upstand is measured from, and how ponding is designed out before the opening is cut.

Section through a roof lantern on a kerbA roof lantern is a pitched glazed structure standing on a kerb above a flat roof. The pitch sheds water and debris and distributes light; it is not a flat rooflight with a hat on.ridge barglazing barkerbflat roof deckpitch sheds water

The kerb does three jobs, and only one of them is holding the lantern up

A roof lantern does not sit on a flat roof. It sits on a kerb: an insulated upstand built off the deck, with the roof covering dressed up its outer face and terminated near the top. The lantern’s ring beam lands on the kerb. It never lands on the roof surface itself.

Three things follow. The kerb lifts the bottom edge of the glazing clear of whatever water the roof is carrying at its wettest. It gives the waterproofing a vertical face to turn up, so the junction between roof and skylight is a lapped detail rather than a sealed flat joint waiting to be tested. And it carries the weight of the assembly down into structure that has been trimmed to take it.

The first of those is the one that gets decided by accident, on site, by whoever is forming the upstand, from what the deck happens to look like that morning. The consequence does not appear until the second winter, when a tide line of green algae shows up along one side of the frame and stays from October to March.

Where the 150mm comes from, and when it is not enough

The number almost every specification works to is 150mm of upstand above the finished roof surface. It is not arbitrary. It is roughly the depth that covers three things at once: the depth of water a blocked outlet can hold before it finds another way off the roof, the height that wind-driven rain splashes back off a wet membrane, and a margin for lying snow that thaws and refreezes at the base of the upstand.

The rule, and the exceptions that matter more than the rule

150mm above the finished surface is the baseline, not the answer. It is measured from the top of whatever the roof is finished in, which is the part that gets missed. On a ballasted roof it is 150mm above the gravel, not above the membrane underneath it. On a warm deck with tapered insulation it is 150mm at the high corner of the kerb, which means the low corner is taller.

Three situations need more than the baseline: a roof that receives discharge from a pitched roof or a wall above it, a kerb sitting in or near the natural flow path to the outlet, and any roof where a ponding area is already known to exist. In those cases the height is measured from the highest water line the roof has actually shown, not from the deck.

Kerb height by what the roof is finished in

The question we get asked at survey is “how tall does it need to be”, and the honest answer is that it depends less on the lantern than on the roof it lands in. The build-up under your feet sets the datum.

Roof finish Where the 150mm is measured from What people get wrong
Single-ply or GRP on a falling deck Top of the membrane at the low side of the kerb Measuring at the high side, which leaves the downhill edge short
Warm deck with tapered insulation Finished surface at each corner separately Building a kerb of one height on a deck that is four different heights
Ballasted or gravel finish Top of the ballast, not the membrane below it Losing 40 to 50mm of upstand to the stone
Existing felt being overlaid The new finished level, after the overlay Setting the kerb to the old surface and burying the base of it
Kerb height, falls and keeping lantern glass clear of standing water
The same lantern after dark, seen from the garden.

Fall is the roof’s job, not the lantern’s

People conflate two different slopes. The lantern has a pitch, which is the angle of its glazed slopes and is usually somewhere between 20 and 30 degrees on a domestic unit. The roof has a fall, which is the slope of the deck taking water to an outlet. They are unrelated, and only one of them is a drainage decision for the flat roof.

Flat roof design here conventionally works to a designed fall of around 1:40, on the basis that tolerance, deflection and settlement eat into it and a finished fall of not less than 1:80 should survive. Design to 1:80 and you often end up nearer flat once the joists take up load, and flat is where standing water lives.

What a lantern adds to that picture is an obstruction. Before the opening was cut, water crossing that part of the roof had a straight run to the outlet. Afterwards it has to go around a rectangle roughly the footprint of the skylight. If the kerb sits square across the fall, the uphill face becomes a small dam, and water backs up against it until it has climbed high enough to go around. That is the puddle people describe as having appeared out of nowhere.

Where the water actually stands, and for how long

A common working definition of ponding is water still standing more than around 48 hours after rain has stopped, in normal drying conditions. Below that, a wet patch is just a wet patch. Above it, you have a body of water in permanent contact with the base of the frame, the sealant line and the bottom edge of the glazing units.

What that contact does is slow and unglamorous. Sealant that is fine in wetting-and-drying cycles softens when it never gets to dry. Edge seals on a sealed glazed unit are designed to shed water, not to stand in it, and a unit whose bottom edge spends winter submerged is a unit that mists years earlier than the one next to it. On a coated frame the water line is where the coating gives up first.

In Canford Cliffs and Branksome Park the problem is usually not the fall — it is the pine. Those are wooded plots under tree preservation orders, with a mature canopy that drops needles continuously rather than in one autumn flush. Needles do not wash to the outlet the way a leaf does; they mat, and they mat first against the uphill face of a kerb, which is the one obstruction on an otherwise clear roof. A roof that drained perfectly for years can start ponding against a new rooflight within a season, and the cause is a 30mm dam of pine litter, not the construction.

Three ways to get a fall into the roof, and what each one costs you

If the deck under a proposed lantern is flat or falls the wrong way, that gets fixed before the opening is cut, not after. There are three routes and they are not interchangeable.

Method What it involves Suits The trade-off
Firrings on the joists Tapered timbers fixed along the top of each joist before the deck goes down A cold deck being re-boarded anyway, or a new extension roof Means lifting the deck; not a retrofit option on a finished roof
Tapered insulation A cut-to-falls insulation scheme laid over the existing deck as part of a warm roof Warm deck build-ups, and roofs being recovered Adds height everywhere, which raises door thresholds and parapet relationships
Local re-lay around the opening Reworking the fall in the zone around the kerb only, so water is steered past it An otherwise sound roof with one problem area Fixes the lantern’s immediate surroundings and leaves the rest of the roof as found

There is a fourth answer we give more often than any of these: recover the roof first, then glaze into it. Putting a twenty-year rooflight into a covering with four years left means opening the finished detail again to replace what is under it.

Kerb height, falls and keeping lantern glass clear of standing water
The pitch throws daylight sideways, lighting the back wall rather than only the worktop.

Setting out a kerb so water leaves it

  1. Find the fall before you find the position. Water on the deck, or a level run across it, tells you which way the roof drains. The kerb is then set out relative to that, not relative to the room below.
  2. Turn the rectangle if you can. A kerb with its long side across the fall dams more water than the same kerb with its long side along it. Where the room allows the lantern either way round, this is a free improvement.
  3. Divert the uphill face. Where the long side has to sit across the flow, the deck uphill of it is formed to split water around both ends rather than deliver it into the middle of the face.
  4. Build the kerb insulated, not hollow. A timber box with nothing in it is a cold bridge around the whole perimeter, and the internal reveal will tell you about it in January.
  5. Check the diagonals, not just the sides. A kerb 5mm out of square is a frame that will not sit down evenly, and an uneven seating is a gasket that is compressed hard on one side and loose on the other.
  6. Dress the covering up and terminate it properly. Membrane or GRP turned up the outer face and finished under a termination bar or trim, so the lantern is landing on a detail that is already watertight without it.
  7. Flood or hose the detail before the frame goes on. Testing the kerb while it is still an open box takes ten minutes. Testing it after the glass is in means taking the glass out.

Ponding you inherit: putting a lantern into an existing roof

Replacement work is where this gets awkward. On an existing flat roof there is usually no drawing, the fall is whatever the original builder achieved, and the only honest evidence is the roof itself. Dirt lines, algae, a rippled membrane and a lighter patch where stone has washed clear all record where water sits, so a survey here is partly archaeology — we read the staining before we measure anything, because it tells us what the roof does in weather we are not standing in.

If a new skylight is going into a roof with a known low spot there are only three honest answers: move the lantern, fix the fall, or raise the kerb above the recorded water line and say plainly that the rest of the roof still ponds.

What we will not do

We will not glaze a lantern into a low spot and rely on sealant to hold the line. A sealed joint below the water line is a joint on a timer. If the roof needs work before it can carry a rooflight properly, that goes in the survey notes and on the quote as a separate item, priced separately, so you can see exactly what is glazing and what is roofing.

A lantern is made to a kerb size, and once it is in production the kerb cannot move. So every question about height and fall belongs before the order: which way the roof falls, what the finished surface will be at the moment the lantern lands, where water goes once the kerb is in the way, and whether the covering has enough life left to justify the work. Our survey answers those in writing, along with the exposure zone your address sits in — a sheltered roof in Old Town takes far less driving rain against the uphill face of a kerb than an open plot at the harbour mouth.

How water that lands on the lantern finds its way down and out is a separate subject, covered in how glazing bars shed water into the kerb. This page stops at the kerb line; that one picks it up there.

Our installation work carries a ten-year workmanship guarantee. It is a workmanship guarantee and it is not insurance backed, which we say plainly because the difference is real. Price is fixed in writing after the roof has been surveyed, never estimated from a photograph. If you want the kerb and fall on your roof looked at before you commit to a lantern, ring 01202 923272, or start at the roof lantern installation page for the wider picture.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272