What a flat roof rooflight has to do
A flat roof rooflight is a glazed unit carried on a kerb above a flat or low-pitch roof. Most people ring us asking for a flat skylight and the trade writes rooflight on the order: same thing. A hole in the roof, an upstand built around it, and a sealed unit on top, so the covering can be dressed up behind the frame instead of stopping at a cut edge.
The choice follows headroom, deck span, whether anyone walks over the glass, and whether the room needs air as well as light.

| Unit type | Pitch on the kerb | Where it earns its place | What to watch |
|---|---|---|---|
| Fixed flat glass | 3 to 5 degrees, built into kerb or unit | Kitchen extensions, hallways, rooms that need light rather than air | A level pane holds water and dries dirt into a tidemark |
| Electrically opening | 5 degrees, so the sash drains clear when shut | Bathrooms and internal kitchens with no openable window | Needs a fused spur and a rain sensor; the cable route is a survey question |
| Walk-on glass | Level, flush with the terrace surface | A roof terrace lighting the room beneath it | Structural kerb, thick laminate, drainage that cannot rely on the glass |
| Domed polycarbonate | Formed into the dome | Like-for-like replacement, garages, outbuildings | Yellows and crazes with UV; the frame is usually due with the dome |
Nothing on a flat roof is actually flat
A flat roof is a drainage design with a misleading name. It falls towards an outlet, and BS 6229, the code of practice for flat roofs, sets the target: design the fall at 1 in 40 so that once the deck has deflected it is still at least 1 in 80. Design to 1 in 80 on paper and a few millimetres of settlement leaves water going nowhere.
Fall matters more at a rooflight than anywhere else on the roof, because the unit is the tallest obstruction on the surface and whatever the roof carries ends up against it. Water still standing 48 hours after rain holds grit against the covering, freezes in the one or two hard frosts Poole gets a winter, and sits where the covering was turned up and terminated.

| What we check | What it should be | What a problem looks like |
|---|---|---|
| Design fall | 1 in 40 to the outlet, in the deck or in tapered insulation | A deck laid level with the covering expected to cope |
| Finished fall | 1 in 80 minimum after deflection, measured not assumed | A straight edge that rocks, or a low spot mid-span |
| Water 48 hours after rain | None standing anywhere | A dried silt ring, a crescent of moss, a patch that never lightens |
So we measure the fall first: a straight edge for the design intent, a hose for what happens.
Warm deck, cold deck, and where the unit ends up sitting
Where the insulation sits decides where the kerb insulation goes, and getting that wrong produces a skylight that works perfectly and still drips. It also sets kerb height, fixing line and reveal.
A warm deck carries insulation above the structural deck with a vapour control layer beneath it. A cold deck puts it between the joists with a ventilated air gap above, and that gap has to carry on ventilating around the opening you have just cut in it. Blocking it with a kerb is a common cause of damp timber under a rooflight that has never leaked.

| Deck build-up | Where the insulation sits | What the kerb has to do | Risk at the skylight |
|---|---|---|---|
| Warm deck | Above the deck, vapour control layer below it | Insulated its full height, unbroken from roof to frame | Low, if the vapour control layer is turned up and sealed to the kerb |
| Inverted or ballasted | Above the waterproofing, held by ballast or paving | Stand taller, because height is measured from the top of the ballast | Upstands set from membrane level end up half the height needed |
| Cold deck | Between the joists, ventilated void above | Let the void keep ventilating on all four sides of the opening | High. Condensation in the void, reported from below as a leak |
On a replacement we open up enough to see what is actually there. Plenty of Poole’s rear extensions were built cold deck and later insulated over the top without the old layer coming out, and that sandwich behaves like neither.
The kerb is the part that decides the job
Almost everything that goes wrong with a flat roof rooflight goes wrong at the upstand. The kerb lifts the frame out of the wettest part of the roof, gives the covering something to turn up against, and presents a flat, square platform of known size to a rigid unit that will not adapt to a roof 9mm out on the diagonal.
Three things decide it. Height: the waterproofing should finish at least 150mm above the finished roof surface, and higher on exposed roofs, because driven rain crossing an open deck at the harbour mouth does not read guidance. On a ballasted roof that 150mm is measured from the top of the paving, which catches people out. Square: a rigid frame on an out-of-square kerb gets packed, and packing is where leaks start. Insulation: bare timber is a cold bridge round the whole perimeter, and in January that puts water on the inside of the frame.
The rule, and the one exception
The rule: the kerb is built, insulated, weatherproofed and then measured, and the unit is ordered from those measurements. Not from the structural opening, not from a drawing, not from a photo with a tape held across it. A sealed unit is made to the millimetre and cannot be trimmed on site.
The exception: extension work still at frame stage, where the builder is working to an engineer’s drawing and the programme cannot carry the lead time. We will order against the drawing with a written tolerance agreed and a check measure before fabrication. Anyone offering to skip the measure should be asked who pays if it does not fit.
Reusing a kerb is often possible and always worth checking. Sound timber, tall enough, square enough, covering with life in it, and the skylight goes back in a day. A 75mm kerb with soft ply at the corners is a rebuild, and saying so is the condition of the guarantee rather than an upsell.

Where the roof covering stops
The rooflight does not keep the water out on its own. The junction does: where felt, single-ply, GRP or asphalt climbs the upstand, terminates and hands over to the frame. Four coverings, four different details, and a firm that treats them alike gets one of them wrong — which is why we ask what the roof is covered with before quoting, and price any roof repair separately from the glazing.

| Covering | How it terminates at the upstand | Where it goes wrong | Our note |
|---|---|---|---|
| Reinforced bitumen membrane (felt) | Bonded up the kerb over an angle fillet, capped under the flange | Stopped short of the top, or no fillet, so it bridges a corner and splits | The commonest covering on Poole’s 1990s extensions, and the most forgiving to detail |
| Single-ply (PVC or TPO) | Hot-air welded to a preformed corner and a coated termination bar | Welds run cold or rushed at the corners, where movement concentrates | Repairs must be welded in the same material; a bitumen patch fails within a season |
| GRP (fibreglass) | Laminated in one piece up and over, dressed into a bonded trim | Cracks at the corner where the laminate ran thin; unsealed cut edges | Cures as one sheet with no movement joint, so the kerb must be rigid first |
| Mastic asphalt | Two coats over an angle fillet, tucked into a chase and pointed | Chase never cut, so the asphalt is sealed on rather than housed | Found on older, larger properties. A specialist trade, so we bring one in |
Condensation is not a leak, and the difference is readable
Every winter we look at rooflights reported as leaking that are doing nothing of the kind. Water inside the glass in the morning, a damp line on the reveal, roof intact and no rain for three days. Warm moist air from a kitchen or bathroom meets the coldest surface in the room — the glass and frame of a skylight — and gives up its moisture there. A misted unit, where the sealed glass has failed internally, is a third thing again and no amount of ventilation clears it.
How to tell which one you have
Condensation appears overnight, worst on cold clear nights rather than wet ones, sits on the glass and lower frame, runs an even line along the bottom of the reveal, and improves with ventilation. Usually an uninsulated kerb, a cold deck void, or a reveal with nothing behind the plasterboard.
A leak follows rain, sometimes only wind-driven rain from one direction, shows at a point rather than along a line, leaves a growing tidemark, and ignores ventilation. Almost always the upstand detail, the covering termination, or a fixing driven where it should not have been.
The fix for condensation is rarely the rooflight. It is insulating the kerb or the reveal, restoring ventilation to a cold deck void, or extracting a room that never had any — and we say so, even though it is the smaller job.

Which exposure zone your roof sits in
Poole is not one exposure. Within about four miles the conditions a flat roof rooflight has to survive change completely, so one build-up across the whole town is an overcharge in one place and thin in another. It shows on a flat unit first, because a level pane holds whatever lands on it.
Canford Cliffs and Branksome Park sit under a mature pine canopy held in place by tree preservation orders. The trees are not coming down, so needles, resin and pollen are permanent rather than seasonal. On a pitched roof they wash off. On a flat rooflight at 3 degrees they gather along the low edge and dam against the frame — which is why we push the fall to the top of the range there and treat self-cleaning glass as the starting point.

| Exposure zone | What it does to a flat rooflight | What changes in the specification |
|---|---|---|
| Severe marine — Sandbanks, the harbour mouth, seaward Lilliput | Salt-laden wind with no fetch break. Salt dries onto a level pane and stays; uplift peaks at the deck corners | Marine-grade coastal coating, A4 (316) stainless fixings throughout, non-ferrous trims, taller upstand, closer fixing centres |
| Sheltered marine — Poole Old Town, the Quay, Hamworthy waterside, Parkstone shore | Salt is present, but the land behind breaks the south-westerly before it lands | Coastal-grade coating, A4 stainless on exposed fixings. Conservation status checked before ordering |
| Wooded and elevated — Canford Cliffs, Branksome Park, upper Lilliput | Constant organic debris, resin that grips, and heavy shade for part of the day | Fall at the top of the range, self-cleaning outer pane as standard, clearer glass because the canopy takes the light |
| Inland — Broadstone, Creekmoor, Canford Heath, Upton | Ordinary weather on the heathland edge, no meaningful salt load | Standard architectural powder coat and standard fixings. Marine upgrades quoted only if you ask, because here they buy nothing |
The zone goes in the survey notes and on the quote with the reason beside it, which is why we publish the zones before anyone rings.
Glazing, solar gain and the light a flat unit gives
A flat skylight drops a pool of daylight straight beneath the aperture rather than throwing it sideways the way a pitched unit does. Excellent over an island, a table or a dark hallway; weaker if you want the back wall of a long room brightened. Position does more work than area.
Two numbers decide the comfort. U-value is heat loss, and Building Regulations in England set 2.2 W/m²K as the limiting standard for a rooflight — ask which plane a quoted figure was measured in, because horizontal and vertical figures are not comparable. The g-value is how much solar energy the glass passes: clear near 0.6, neutral solar control around 0.4, high performance around 0.3. A flat unit faces straight up and takes more summer sun per square metre than any window in the house, so a large clear-glazed rooflight over a south-facing Parkstone kitchen is uncomfortable by July.
The safety glazing rule, and why we do not vary it
Overhead glazing gets a laminated inner pane. Toughened glass breaks into small fragments and drops them; laminated holds together on its interlayer. Above a room where people stand and cook that is not the place to save money, so our default is a toughened outer and laminated inner on every flat rooflight we fit.
Walk-on units are a different specification again: a thicker multi-laminate build-up, a structural kerb and a slip rating on the top surface. A standard flat skylight must never be signed off as one because a terrace was added later.
What the survey settles
We do not price a flat roof rooflight from a photograph. The survey is the method, and it ends in a fixed written price.
- The exposure zone, named in writing. Which of the four zones your address sits in, and therefore the coating, fixing grade, fall and glass.
- The deck build-up. Warm, cold or inverted; what the deck is made from; joist size and spacing; what needs trimming.
- Falls and drainage. Measured, not assumed. Where water goes now, where it will go around the new opening, and whether tapered insulation is needed.
- The kerb. Reuse or rebuild, the height it must reach, how it is insulated, and when the measure happens — the lead time runs from the measure, not the order.
- The covering and its termination. What the roof is covered with, how the detail is formed, and any roof repair priced separately.
- Glazing. Orientation, shading, the g-value that follows, and whether an opening unit earns its electrics.
- Approvals. The Building Control route with BCP Council or an approved inspector, and whether conservation area status around the Old Town and the Quay, listed status or a planning condition applies.
- The price, in writing. One itemised figure that holds unless you change the scope.
Most flat rooflight work is permitted development and needs no planning permission, but it nearly always needs Building Control, because you are altering roof structure and installing a thermal element. Two different approvals, constantly confused.
Fitting, in order
- Access and protection. Floors covered, route agreed, tower or scaffold where a ladder will not do.
- Opening formed. Deck cut to the marked line, joists trimmed and hung rather than skew-nailed, the opening made square.
- Kerb built and insulated. Upstand to the agreed height, insulation continuous with the roof, vapour control layer turned up and sealed, diagonals checked.
- Roof closed. Covering dressed up the kerb and terminated to the detail it needs, before the day ends.
- Measure and order. Taken off the built kerb. This is the lead time, and why a new opening is two visits rather than one.
- Set, fix, test, hand over. Unit bedded and levelled, fixed at the centres and grade the zone calls for, hose tested, reveal made good, paperwork handed over with the zone and the guarantee on it.
A replacement into a sound kerb is one day, opened and closed. A new opening is two visits with the kerb lead time between them, and the roof is weathertight at the end of each.
What we put in writing, and what we will not claim
This is a new firm.
The two things you get in writing
A ten-year workmanship guarantee on our installation work. It is a workmanship guarantee and it is not insurance backed. We say so plainly, because the difference is real and you should know which you are being offered. Glass and frame components carry their own manufacturer warranties.
A fixed written price after survey. Not a range, not a guide figure. If something genuinely unforeseeable turns up — soft deck under an intact covering is the usual one — we stop, show you, and price the repair separately before going further.
We install and replace skylights and rooflights across Poole and about thirty miles around it, and that is all we do — not general roofing, not extensions, not developer work. To find out which exposure zone your address falls in, or whether the water on your frame in January is a leak or condensation, ring 01202 923272. The zone we can tell you on the phone. The rest needs the roof measured.
In this section
Broadstone and Creekmoor roofs where standard specification is right
Standard specification is the right answer here, and we will say so Most of this site argues that a flat…
Can a flat rooflight be fitted from inside?
Effectively no — not the part that keeps water out. A flat roof rooflight is weathered by dressing the roof…
Can a flat rooflight be fitted to a shed or outbuilding roof?
Yes, and it is usually the simplest work we do Yes. A flat rooflight goes into a garage, workshop, garden…
Can a flat rooflight be retro-fitted to an existing flat roof?
Yes — retro-fitting into an existing flat roof is the majority of this work, not the exception. What decides whether…
Can I fit a flat rooflight to a felt roof?
Yes, and felt is one of the more forgiving coverings to detail Yes. A flat rooflight can be fitted to…
Can two flat rooflights be fitted side by side?
Yes, and it is a common arrangement — but the interesting part is not the two units, it is the…
Do flat roof rooflights leak?
A properly detailed one does not No. A flat roof rooflight that has been detailed properly does not leak, and…
Do flat rooflights need a kerb?
Yes, though it may not be one anybody builds on site Yes. Every flat roof rooflight sits on an upstand…
Do flat rooflights need planning permission?
Usually not, but flat roofs fail the test more often than pitched ones Most rooflights go in under permitted development…
Does rain sound loud on a flat rooflight?
On glass, no. On a plastic dome, yes. Rain on a modern glass flat rooflight is audible and is not…
Drainage falls that move water past a rooflight instead of round it
What a kerb does to water that was minding its own business Before the rooflight went in, rain landed on…
Fixed, hinged and pop-up units on a low pitch deck
Start with whether it needs to open at all On a pitched roof the answer is usually yes, because a…