Does BCP building control check rooflight U-values?
Where the work is notifiable, yes — but as a paper check rather than a measurement. Building control wants the manufacturer’s declared figure for the specific unit, compared against the standard that applies to your kind of work. Nobody comes and tests the installed skylight. What is inspected on site is everything around it: insulation continuity, ventilation provision, safety glazing and structure.
What “checking” means in practice
A U-value is a declaration made by a manufacturer to a product standard, not something an inspector can establish on a roof. So the check is documentary: is there a figure, is it for the actual product, does it meet the limit. That is a two-minute exercise when the paperwork exists and an awkward conversation when it does not.
When the work is notifiable at all
Replacing a rooflight, or forming a new opening in a roof, is generally building work that needs to be notified. A genuine like-for-like repair — a new gasket, a reglaze of a broken pane in an existing frame — usually is not. An extension always is.
There are two routes for notifiable work. Either it goes to a building control body before it starts, or the installer is registered under a competent person scheme and self-certifies afterwards.
Which authority, and it is not always BCP
| Body | Where it covers | Note |
|---|---|---|
| BCP Council | Poole, Bournemouth, Christchurch and their suburbs — Parkstone, Canford Cliffs, Branksome Park, Hamworthy, Southbourne, Boscombe | The one most people in the service area deal with |
| Dorset Council | Wareham, Swanage, Corfe Castle, Langton Matravers, Wimborne, Blandford, Dorchester, Weymouth and the Purbeck area | A different authority a few miles the other side of the harbour |
| New Forest District Council | Lymington, Brockenhurst, Ringwood, Fordingbridge, New Milton | Across the county boundary in Hampshire |
| A private approved inspector | Available in place of the local authority on most work anywhere in the area | Changes who inspects, not which standards apply |
What they will actually want to see
- The declared whole-unit U-value for the specific rooflight, attributed to the manufacturer.
- Glazed area, where the work is an extension, against the allowance for the new floor area.
- Ventilation provision, since replacement glazing generally has to provide background ventilation at least equivalent to what it replaced.
- Safety glazing over occupied space, and any glazing in a position where people could fall against it.
- Structural trimming where an opening has been formed or enlarged in a roof.
- Insulation continuity at the kerb, which is the item most often inspected properly and most often built badly.
The figure is a declaration, not a test on your roof
Two things worth knowing about the number being checked
It is declared in the vertical plane, even though your skylight will lie at a shallow pitch for the rest of its life. Every manufacturer does this, so the figures are comparable with each other but slightly optimistic about installed performance.
It describes the unit, not the opening. The thermal bridge round the perimeter is accounted for separately, and a rooflight with an excellent declared figure sitting on an uninsulated kerb will still perform badly. What the number covers is on what a rooflight U-value covers.
If it never got signed off
Unsigned work becomes a problem at sale, not at installation. Conveyancing enquiries ask for the completion certificate or the competent person certificate for replacement glazing and for any extension, and its absence has to be dealt with — commonly by indemnity insurance, sometimes by applying to the authority to regularise work carried out without notification.
A regularisation application is possible for work already done, and the authority may require parts of the construction to be opened up so it can be inspected. Whether an application succeeds is decided on its merits by the council concerned, and we will not tell you what any authority will conclude.
The cheap version of this problem is doing it properly at the time. The expensive version arrives several years later with a buyer’s solicitor attached.
What we hand over
The quotation names the unit, its manufacturer, the declared whole-unit U-value attributed to them, the g-value and light transmittance, the compliance route the work falls under and the authority that will sign it off. At completion you get the manufacturer’s documentation for the actual product, not a brochure for a range.
We will not claim a rooflight will pass a calculation we have not seen, and we make no claim to registered installer status we do not hold. Our installation work carries a ten-year workmanship guarantee — a workmanship guarantee, plainly, and not insurance backed — with a fixed written price after survey. Ring 01202 923272 and tell us where the roof is; that decides which of the four bodies above you are dealing with.
Related reading
Argon and krypton fills matter less than the brochure suggests
The cheapest line on the specification is usually the loudest Argon fill appears on almost every glazing quotation in the…
Condensation on the inside of the glass is a humidity problem
A week with a hygrometer settles it faster than an argument Almost every conversation about a wet skylight starts in…
Do rooflights cause draughts?
A correctly installed one should not. When a skylight is blamed for a draught it is almost always one of…
Do rooflights help with damp in a room?
With one kind of damp, and only if it opens. A skylight does nothing whatever for rising or penetrating damp…
Do rooflights lose more heat than walls?
Per square metre, yes, and it is not close. Any glazing loses heat several times faster than the insulated fabric…
Do rooflights make a room colder in winter?
No, not a modern one. A well-specified rooflight in a well-detailed opening adds heat loss in the same way any…