How much does a roof lantern weigh?

The short answer

Most of a roof lantern is glass, and glass weighs about 2.5kg per square metre for every millimetre of thickness — so rather than guess, you can work the figure out. A double-glazed lantern is commonly somewhere around 30 to 35kg of glass per square metre of glazed surface, with the frame on top of that.

Section through a roof lantern on a kerbA roof lantern is a pitched glazed structure standing on a kerb above a flat roof. The pitch sheds water and debris and distributes light; it is not a flat rooflight with a hat on.ridge barglazing barkerbflat roof deckpitch sheds water

Start with the glass, because that is most of it

Glass has a density close to 2,500kg per cubic metre. Divide that down and you get a number worth remembering: 2.5kg per square metre per millimetre of thickness. A 4mm pane weighs 10kg per square metre. A 6mm pane weighs 15kg. That arithmetic holds for float, toughened and laminated alike, with laminated a shade heavier because of the interlayer.

Aluminium frames are light for their strength, which is why a slim-bar lantern can span what it does. Timber is heavier, uPVC lighter and bulkier. But in every case the glass dominates, and if you know the make-up you know most of the answer. The same arithmetic works for a flat rooflight or a roof window — a lantern is simply carrying more glazed surface than the hole it covers.

What each make-up weighs

Glass make-up Weight per m² of glass Where it turns up
4mm toughened, single skin About 10kg Older single-glazed lanterns and porch canopies
6mm toughened About 15kg The outer leaf of most modern sealed units
6.8mm laminated About 17kg The inner leaf, where glass overhead must stay in place if it breaks
Double-glazed unit, toughened outer and laminated inner Around 32kg The standard specification for a lantern or a flat skylight today
Triple-glazed Materially more again Occasionally specified for thermal reasons; check the data sheet, not a rule of thumb

The manufacturer’s data sheet carries the exact figure for the unit being quoted, and that is the number a structural check uses. The arithmetic above is for deciding whether you are in the right order of magnitude before anyone comes out.

A worked example, so the number means something

Take a lantern over a 2.0m by 1.5m opening — three square metres of aperture. Because the roof of a lantern is pitched, the glazed surface is larger than the hole it covers; at a typical pitch that is somewhere near 3.3 square metres of glass. At 32kg per square metre that is roughly 105kg of glass. Add an aluminium frame and the kerb hardware and the assembly lands in the region of 150kg.

That sounds alarming until you spread it. The load is carried on the kerb, which for that lantern is about seven metres of perimeter — so roughly 20kg for every metre run of timber, sitting directly over trimmed joists. One adult standing on the deck concentrates more weight into a smaller area than the lantern does.

Per-pane weight is what governs the day

The number that decides how the job is run

Total weight tells you whether the roof copes. Per-pane weight tells you how the lantern gets onto it. A single 1.2m by 1.0m pane of that double-glazed make-up is close to 40kg — well past what one person should be lifting above shoulder height on a scaffold, and the reason panes go up one at a time after the frame is set rather than as a pre-glazed assembly.

The exception is a small replacement unit going back into an existing frame, which two people handle comfortably.

Getting it onto the roof

  1. Measure the route before the order. Side access width, gate openings, overhead cables and the standing ground for a tower or a lift all get checked at survey, because the biggest pane that fits the design is no use if it cannot reach the roof.
  2. Frame first. The ring beam and rafter bars go up empty and are levelled and fixed while they are still light enough to adjust.
  3. Panes individually. Each one lifted, set on its supports and capped before the next comes up.
  4. Mechanical lift where the arithmetic says so. Large panes, high roofs and awkward standing ground get a lift rather than a rope and optimism. That is priced in the quote, not sprung on you afterwards.

How long that sequence takes is a separate question, answered on how long fitting a roof lantern takes.

Does the roof need strengthening?

Usually not, for a lantern going into a correctly trimmed opening on a sound deck. Cutting the opening is the bigger structural event: joists are cut, so trimmers take the interrupted loads to the neighbouring joists, and that is what needs designing. The lantern’s own weight is modest by comparison and lands on the strongest line of the new arrangement.

When the answer changes

A tired deck, an old opening that was formed without trimmers, a span already at its limit, or a lantern much larger than the original aperture — any of those turns it into a question for a structural engineer rather than a matter of judgement on site. Nobody should be guessing at this, ourselves included.

What we settle before anything is ordered

At survey we record the opening, the deck build-up, the joist direction and spacing, the route to the roof and the exposure zone the address sits in. From that comes the specification, the glass make-up, the lifting method and a fixed written price — one figure, with any roof repair shown separately.

What we will not do is quote a weight from a photograph. If you want a sense of scale before you commit, ring 01202 923272 with the opening size and the make-up you have been offered and we will do the arithmetic with you on the phone. The ten-year workmanship guarantee on our installation work is stated plainly on our guarantee — it is a workmanship guarantee and it is not insurance backed.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272