Is my roof open to the weather while a roof window goes in?

The short answer

On a single roof window into an existing pitched roof, the hole in your roof exists for a matter of hours, usually inside one working day, and the roof is weathertight again before anybody leaves. That is not a promise about the weather being kind. It is how the job is sequenced: nothing is opened until everything needed to close it is on site and on the roof.

A roof window set between rafters in a pitched coveringThe window sits in the plane of the covering between existing rafters. A flashing kit matched to the covering carries water around the frame, and the underlay is dressed to a collar so anything passing the tiles is returned to the outside.roof windowrafterrafterflashing kitcovering

Open for a few hours, and never left open overnight

The fear behind the question is a reasonable one. It is the second thing people ask after “will it leak”, and it deserves a straight answer rather than reassurance, because the honest version has conditions attached to it.

A single window, in order

  1. Access goes up first, with everything unloaded and staged before a tile is touched.
  2. Inside, the ceiling area is sheeted and the opening is formed from below wherever the build-up allows.
  3. The covering comes off around the opening, a course or two wider than the frame each side.
  4. Underlay is cut and dressed, the frame goes in, and it is squared and fixed. This is the exposed window, and it is short.
  5. Apron, side and head flashings go on in sequence and the covering is re-laid over them.
  6. The roof is now weathertight. Everything after this, collars, reveal, decoration, happens inside with the roof closed.

Steps three to six are where your roof is genuinely open, and on a straightforward unit they are a morning’s work.

What is between your ceiling and the sky while it is open

Stage What is protecting the house If the weather turns
Covering stripped, underlay intact The felt or membrane, which is doing its normal job Lay the slates back loose and stop. Minimal risk
Underlay cut, frame not yet in A temporary cover only. This is the exposed moment Nobody starts this stage with weather visibly coming in
Frame in, flashings not complete The unit itself, plus a dressed temporary detail at the head Sheet over the head, finish the flashing, then carry on inside
Flashed and re-laid The finished roof, as before Nothing to do. The remaining work is internal

Weather we will not open a roof in

A postponed day costs less than a wet ceiling

Persistent rain, strong or gusting wind, or a forecast that turns inside the working window: the roof does not get opened. A roof window can always be fitted tomorrow. A saturated ceiling, a wet insulation layer and a plasterboard reveal that has to come out again cannot be undone tomorrow.

That includes days that look fine at eight in the morning. On this coast the forecast that matters is the one for early afternoon, when the sea breeze fills in.

Wind on the spit is its own decision

Sandbanks, the harbour mouth and Studland have no fetch break, so wind arrives at full strength with nothing to slow it. A wind speed that is a nuisance in Broadstone is a stop on the spit, both for safety at height and because loose covering material will not stay where it is put.

It is one of the reasons exposure zone is written on the quote. It changes the fixings, the finish and, on some days, whether work happens at all.

The jobs that run over more than one visit

Some do. A structural opening that needs a rafter trimmed, a run of three windows, a recessed installation, or a job where access has to be built and struck around other trades will spread across days. What does not spread across days is the open part. Each visit is planned so that the roof is closed and weathertight at the end of it, even if the inside is nowhere near finished.

Where a rooflight on a flat deck is involved rather than a window in a pitch, the pattern differs again, because a kerb often gets built on one visit and the unit measured and fitted on another. The roof is still closed between the two.

Inside the house while it happens

Expect dust, and expect the room below to be out of use for the day. A loft conversion job is dirtier than a bare loft job because there is a finished ceiling to protect. Sheeting goes down, the opening is formed to contain debris where possible, and old insulation, which is the dustiest part of the whole business, gets bagged rather than shaken out.

What you should not expect is to find your roof open and the crew gone. If anybody suggests leaving an opening covered with a tarpaulin overnight on a house with people sleeping in it, that is not a method, it is an apology waiting to happen.

What we put in writing before the first tile moves

On the quote, not in conversation

The access method, the number of visits, which visit opens the roof, and the point in each visit at which the roof is closed again. Plus the exposure zone your address sits in, because on the spit that governs when the work can happen as well as what goes on the roof.

Workmanship carries a ten-year guarantee, stated plainly as not insurance backed, and the price is fixed in writing after a survey rather than estimated from a photograph.

The question to ask any installer

Ask exactly when the covering comes off and exactly when it goes back on, in hours, for your job. Anyone who has actually planned the work will answer without hesitating, because the sequence is the same every time and only the durations change. Anyone who has not will talk about the product instead.

If you are weighing up a skylight for a loft bedroom and the open-roof question is what is holding you up, ring 01202 923272 and we will talk you through the day on your particular roof.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272