Batten gauge, tile course and lining a window up with the roof
How gauge, lap and the tile module across a slope govern where a roof window can be positioned so that it reads as part of the roof rather than an intrusion.
You can see a badly set out window from the pavement
Stand on any residential street in Poole and look at the roofs. Every so often there is a window that looks wrong, and most people cannot say why. The flashing is intact, the glass is clean, nothing leaks. What is wrong is that the frame does not agree with the roof around it: the tiles above it run at one rhythm, the tiles below it run at another, and somewhere along one side there is a thin cut slip of tile filling a gap that should never have existed.
That is a setting-out failure, and it happens before anything is fixed. It is entirely avoidable, it costs nothing extra to get right, and it is the clearest single indicator of whether the person on your roof has done this before. This guide is about the arithmetic underneath it.
Gauge, lap and course, defined properly
A tiled or slated roof is a series of horizontal rows, each overlapping the one below. Those rows are the courses. The battens they are nailed to are spaced at the gauge, measured centre to centre up the slope. The amount one course covers the one below is the lap, or in the case of a double-lap covering like plain tile or slate, the headlap onto the course two below.
Gauge is not a preference. It is derived: take the tile or slate length, subtract the lap you need, and on a double-lap covering divide what is left by two. Change the lap and every batten on the roof moves. That is why the gauge on a roof is fixed the day it is laid and why a window has to be fitted into it rather than the other way round.
| Covering | Lapping | What sets the gauge | Typical gauge range |
|---|---|---|---|
| Clay or concrete plain tile | Double lap | (Tile length minus headlap) divided by two | Roughly 90mm to 115mm. Small courses, very forgiving round an opening |
| Natural or fibre cement slate | Double lap | (Slate length minus headlap) divided by two, headlap increasing as pitch falls | Wide range, set by slate size. Unforgiving of anything proud |
| Interlocking concrete tile | Single lap | Tile length minus the minimum headlap the maker allows | Often 300mm to 345mm. Big steps, so a frame rarely lands neatly |
| Clay pantile and interlocking clay | Single lap | Tile length minus lap, plus a side interlock that fixes the horizontal spacing too | Similar to concrete, with far less tolerance sideways |
| Purbeck stone slate | Double lap, diminishing courses | Changes course by course as the stones get smaller up the slope | No single figure exists. Set out on the roof, stone by stone |
The window is a rectangle in a striped field
Here is the real problem. The roof is striped horizontally at a fixed interval. The window is a rectangle of a fixed height that takes no notice of that interval. Unless you are extremely lucky, the top and bottom of the frame land somewhere in the middle of a course rather than on a joint.
Above the window this is dealt with by the head flashing and a course cut to length, dressed down over the top apron. Below it the sill apron sits over a full course and the tiles are cut to sit against it. Both of those are normal and neither shows from the ground when the position is chosen well. What shows is when the installer ignores the choice entirely and leaves the covering to sort itself out.
The move that makes it invisible is small: shift the frame up or down the slope by the few centimetres needed so that the head lands just above a batten and the sill just below one. On a plain tile roof with a 100mm gauge you are never more than 50mm from a good answer. On an interlocking concrete roof with a 340mm gauge you may have to move the window the better part of a third of a metre, which is a design decision about head height rather than a detail, and it has to be made in the loft with the homeowner rather than on the roof at nine in the morning.
Sideways is the tighter constraint
Vertically you can slide the frame. Horizontally, on a single-lap covering, you often cannot, because the tiles interlock and the perpendicular joints fall on a fixed grid across the roof. A frame that lands mid-tile forces a cut slip down one side, and a slip narrower than about half a tile has nowhere to be nailed, nothing to interlock with, and a habit of lifting in the first hard south-westerly off the harbour.
The rule we work to
The roof covering is never cut to suit the window if the window can be moved to suit the roof. The order is: choose the room position, find the nearest tile module and batten line that serves it, then fix the frame there. A slip narrower than half a tile, a course cut to a taper, or a batten packed out to make a frame line up are all signs the sequence was run backwards. The one genuine exception is a heritage covering laid in diminishing courses, where the module changes every course and the leadwork is cut on the roof to suit whatever the stones do.

Verge, valley, hip and eaves: keep clear
The frame also has to keep its distance from everywhere the roof changes direction, because those junctions have their own weathering details and the two must not fight.
| Junction | Why the window must stay clear | Practical consequence |
|---|---|---|
| Verge or gable edge | The verge detail, undercloak and any mortar or dry system need a full tile to bed against | Keep at least a full tile width in, and more on an exposed gable |
| Valley | A valley concentrates the run-off from two slopes and the side flashing cannot compete with it | Keep well clear. A window discharging towards a valley is a callback waiting to happen |
| Hip | Hip tiles and the cut course under them need room, and the bay narrows as it goes down | Move inboard. The corner bays of a hipped roof are usually unusable anyway |
| Ridge | Courses above the head have to carry the flashing and reach the ridge properly | Keep a sensible number of full courses above the head flashing |
| Eaves | The tilting fillet, the first course and the ventilation path all live here | A sill dropped to the eaves blocks the ventilation path into the roof |
| Chimney or vent pipe | Two flashings sharing a course means water crossing from one to the other | Keep clear courses between them so each drains independently |
Two windows, and the lines people actually notice
A pair side by side is straightforward: they sit in the same courses, the heads line up, the sills line up, and a combination flashing handles the gutter between them. Nobody looks at a matched pair and thinks anything.
Two units stacked one above the other on the same slope is harder, because the head of the lower one and the sill of the upper one both have to land on sensible course lines, and the number of full courses between them is what the eye reads. Get it right and it looks intentional. Get it wrong and there is an awkward band of three and a half courses between two frames that will annoy somebody for thirty years.
Units on two different slopes, front and back, are not usually seen together, so the courses need not relate. What does need to relate is the head height inside, if the two rooms are meant to feel like a pair.
The battens themselves
Everything above assumes the battens are sound and correctly specified. On older Poole roofs that is often an assumption too far. Pre-war battens were frequently ungraded sawn softwood of whatever section was to hand, and some of it is now split along the nail line, sapwood-soft, or riddled where beetle has been through it. Anything from about the 1980s onwards should be graded roofing batten, and it is usually marked as such.
A batten that will not hold a nail will not hold a tile, and it certainly will not hold the tiles that have to be re-laid tight against a new flashing. Where the battens around the opening are past it, they are replaced in the disturbed area as a matter of course and the new ones set to the existing gauge, not to a fresh one. Mixing gauges inside one slope is the other way a window ends up looking wrong.

How it is set out on the day
- The internal position is agreed in the loft first: which bay, what head height, what the window is meant to show.
- From inside, the corners of the intended opening are drilled through the covering so they can be found on the outside.
- On the roof, the gauge is measured across at least six courses and averaged, because no hand-laid roof is perfectly consistent.
- The frame position is adjusted up or down the slope to the nearest batten line that suits the head and sill, and sideways to the nearest tile module, then marked.
- Only then is the covering lifted, the battens cut back, and the structural opening formed to the marked lines.
- The frame is set, checked for square across both diagonals and for wind across the frame, and fixed. A frame out of wind twists the sash and the sash never closes evenly afterwards.
- Battens are made good to the existing gauge, the flashing is built up from the bottom, and the courses are re-laid into it.
Poole is a mixed-covering town, which is why this matters more here than in a town built all at once. A single street off Ashley Cross can run clay plain tile, 1970s concrete interlocking, natural slate and a re-covered pantile within twenty houses. The gauge changes at every boundary, and so does the answer to where a window can sit. There is no house-type rule to fall back on, only the roof in front of you.
What we settle before the frame is fixed
The gauge and the lap, the tile module across the slope, the clear distances to verge, valley, hip, ridge and eaves, the condition of the battens in the disturbed area, and whether any salvaged tiles exist. Those six settle the position to within a few centimetres, and the few centimetres are the difference between a window that reads as part of the roof and one that reads as an afterthought.
It applies whichever word you use. A homeowner asking for a skylight, a builder writing rooflight on a schedule and a manufacturer calling it a roof window are all describing a rectangle that has to agree with the courses around it. Our installations carry a ten-year workmanship guarantee, stated plainly as not insurance backed, and a fixed written price after survey. Ring 01202 923272.
Related reading
1930s semis in Poole: rafter spacing and the window sizes it allows
Half of suburban Poole was built to one drawing Between the wars the town spread outwards fast, and it spread…
Can a roof window be fitted above a staircase?
Yes, and a stairwell is often the best place in the house for one A roof window over a staircase…
Can a roof window be fitted from inside the loft?
Part of it, yes. All of it, no. A roof window cannot be fitted entirely from inside the loft, and…
Can a roof window be fitted over a bath or shower?
Yes, and a bathroom is one of the best rooms in a house for daylight from above. Three things change…
Can a roof window be fitted to a slate roof?
Yes, with a flashing kit made for slate Slate is one of the easiest coverings to put a roof window…
Can a roof window be moved to a different part of the roof?
Yes, but treat it as two jobs rather than one. A new opening is formed and weathered wherever the window…