Flashings for a sun tunnel on tile, slate and a flat roof

What a flashing is actually doing, how the kit changes with the covering, and the underlay detail that decides whether a tunnel stays dry once the sealant has aged.

A sun tunnel run from dome to diffuserLight enters at the dome and is reflected down the tube to a ceiling diffuser. Every bend costs reflectance, so a straight short run delivers far more than a long one with turns. Light falls with the square of the diameter.daylightdomeevery bend costs lightceiling diffuser

Almost everything that goes wrong with a sun tunnel at roof level is a flashing decision made badly, and almost every flashing decision made badly comes from the same root: the kit was chosen to suit the tunnel rather than to suit the roof it was going into.

Around this service area the coverings change street by street. Profiled concrete tiles across the interwar suburbs, natural and fibre cement slate on the Victorian villas, felt and single-ply on flat-roofed extensions, and Purbeck stone out towards Corfe Castle and Swanage. One kit does not cover that. This page sets out what a flashing has to achieve and how it changes as the covering changes.

What a flashing is actually doing

A flashing is not a seal. It is a lap. Water arriving from higher up the roof runs over the top edge of the flashing, travels across it, and is discharged onto the covering below the opening. The flashing tucks under the courses above and sits over the courses below, and gravity finishes the job. Nothing is asked to stick to anything permanently, which is exactly why the detail outlives the materials it is made from.

A rooflight upstand works on the same principle at a larger scale. The distinction with a tunnel is one of size rather than kind: a small round opening in a covering made of rectangles, which means the skirt has to be dressed into a pattern it does not naturally suit.

The coverings around here, and what each wants

Covering Where it turns up Flashing approach The usual mistake
Profiled concrete interlocking tile Most interwar and post-war suburbs, Broadstone to Winton Deep-profile kit, skirt dressed into the tile contour A flat kit on a profiled tile, gaps filled with mastic
Plain clay or concrete tile Older villas, Parkstone and Penn Hill Low-profile kit, more courses lapped Skirt too short for the small tile module
Natural or fibre cement slate Victorian and Edwardian stock across the area Flat kit, slates cut and re-hung with clips Nail-holing slates that then slip a winter later
Flat roof, felt or single ply Rear extensions everywhere Kerb or upstand, membrane dressed up and over Treating a pitched kit as if it will work lying flat
Purbeck stone slate Corfe Castle, Langton Matravers, Swanage Bespoke, usually leadwork, designed for that roof Assuming a standard kit exists. None fits

Profiled tile, which is most of the work here

The interlocking concrete tile that covers so much of Poole has a strong contour, and a flashing for it is pressed to match. The skirt has to sit down into the troughs and over the rolls without bridging, because a skirt that bridges leaves a channel under it and a channel under a flashing is a route for wind-driven rain.

The fit is checked dry before anything is fixed. Where the opening lands part-way across a tile, tiles are cut and supported rather than broken and bedded, and the courses above are re-laid over the skirt so the lap runs the right way. On a shallow pitch the laps are working harder than on a steep one, which is worth remembering on bungalows and on the low-pitched post-war stock.

Slate, and the temptation to nail

Slate is unforgiving because it is brittle and because it is hung rather than interlocked. Cutting slates around a round opening leaves pieces that have lost their original fixing, and the correct answer is to re-hang them with clips or hooks so that each piece is held without being nailed through its exposed face.

The alternative, which is quicker and which you will see on plenty of roofs, is to nail through the face and dab the head with sealant. It works until the sealant goes, and then it is a hole in a slate above your tunnel. On the older slate roofs around Parkstone and the Bournemouth suburbs the slates are often at the end of their serviceable life anyway, and a tunnel opening is a reasonable moment to have that conversation rather than a moment to make it worse.

Flashings for a sun tunnel on tile, slate and a flat roof
The roof end: a small dome that needs its own flashing like any other opening.

The underlay, which is the part nobody sees

The second line of defence, and the one that gets slit

Under the covering there is a felt or breather membrane, and it is a water barrier in its own right. Anything the covering lets past — wind-driven rain, snow, a slipped tile in a gale — is meant to land on that membrane and run down it to the gutter.

Cutting a round hole for a tunnel means cutting that membrane, and how it is cut decides whether the roof still has its second line. Done properly the membrane is cut back, dressed around the opening and lapped so that water running down it is carried past the hole rather than into it. Done quickly it is slit with a knife and left, which is invisible from the loft, invisible from outside, and shows up as an occasional damp patch during driving rain that nobody can account for.

Flat roofs, which are a different job

A flat roof does not shed water the way a pitch does, so the detail changes in kind rather than degree. A tunnel through a flat deck sits on a kerb or upstand that lifts the opening clear of the roof surface, and the covering — reinforced bitumen membrane, single-ply, or a glass-reinforced polyester laminate — is dressed up the kerb and terminated properly at the top.

Each covering has its own termination rules and its own compatible materials, and mixing systems is a reliable way to produce a joint that fails early. A single-ply membrane wants its own welded detail; a GRP roof wants the laminate taken up and bonded; a felt roof wants the layers dressed and capped. The upstand height matters too, because ponding on a flat roof is normal and the detail has to sit above the worst of it.

Whether a tunnel is even the right product on a flat roof is a separate question, and often the answer is no — the deck is directly over the room, which is the classic case for a flat roof rooflight instead. That has a sun tunnel be fitted to a flat roof.

Purbeck stone, briefly

Corfe Castle, Langton Matravers, Swanage

Purbeck stone slates are heavy, thick, irregular and laid in diminishing courses, largest at the eaves and smallest at the ridge. No standard flashing kit fits one, because there is no standard module to press a skirt to match.

The answer on those roofs is a designed detail, usually in lead, worked around the stones that are actually there. Heritage constraint often comes with it: much of that area sits under Dorset Council with the Dorset National Landscape and the Jurassic Coast World Heritage Site nearby, and consent is assessed on merit rather than assured. The full treatment is on the Purbeck stone answer.

Fixings, and the zone the roof sits in

What holds the flashing down is chosen for the exposure, not for the catalogue. Out on the spit at Sandbanks and Studland, with water on both sides and a south-westerly arriving with no fetch break, fixings are stainless and materials are selected to live with salt. The same applies in a softer way along the coastal strip through Southbourne and Christchurch, and hardest of all on the directly exposed ground at Portland and Milford on Sea.

Inland it is different and we say so. In Broadstone, Creekmoor, Canford Heath, Ferndown and Wimborne the salt load does not justify marine-grade specification, and quoting it there is an overcharge. What those roofs want instead is ordinary good practice: correct laps, correct fixings for the covering, and a shallow-pitch detail where the pitch is shallow.

Flashings for a sun tunnel on tile, slate and a flat roof
A short straight run loses far less light than a long bent one.

The order of the work on the day

  1. Confirm the opening from inside. Position set and checked against the route before anything on the roof is touched.
  2. Strip back, do not break. Courses lifted and set aside in order so they can go back as they came off.
  3. Form the opening. Battens cut and trimmed as the roof structure requires, nothing structural altered without it being designed.
  4. Dress the underlay. Cut back, lapped and shaped so water running down the membrane passes the opening.
  5. Set the flashing. Dry-fitted, checked for bridging, then fixed with every lap shedding downhill.
  6. Reinstate the covering over the skirt. Cut pieces supported and clipped, not nailed through the face and sealed.
  7. Fit the dome and check from inside. Daylight visible, no light showing where it should not be.

Sealant is not a flashing

If the sealant is doing the work, the detail has already failed

Sealant belongs at the edges of a correct detail, never in place of one. A bead of mastic round an opening is watertight on the day it is applied and for some years after. Then it shrinks, the joint moves with temperature, and water finds the gap. By then the installer is long gone and the homeowner is looking at a stain on a bathroom ceiling.

The same goes for mortar. A collar of sand and cement around a tunnel opening cracks, and cracked mortar holds water against the covering rather than shedding it. If someone proposes either as the primary weathering for a new opening, that is the moment to stop.

What we put in writing

The quotation names the covering we found, the flashing kit specified for it, and the exposure zone we have placed the roof in, so you can see why the fixings are what they are. Where a bespoke detail is needed — stone, an unusual covering, an opening that lands awkwardly — that is described rather than absorbed into a line item.

If a survey finds the covering is at the end of its life, or that the position you want cannot be flashed properly, we will tell you before you commit rather than after the roof is open. And if the room would be better served by a skylight on the slope than by a tunnel through it, you will hear that too. Fixed written price after survey, ten-year workmanship guarantee which is ours and is not insurance backed. Ring 01202 923272.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272