Do flat rooflights need a kerb?
Yes. Every flat roof rooflight sits on an upstand of some kind, because a unit laid straight onto the roof surface has its weakest joint sitting exactly where water collects. What varies is who builds the upstand: a carpenter on your roof, or the factory that made the unit.
Yes, though it may not be one anybody builds on site
So the useful version of the question is not whether you need a kerb. It is which of the four arrangements below suits your roof, your headroom and your budget.
Four ways a unit meets the roof
| Arrangement | How it works | Where it suits | What to watch |
|---|---|---|---|
| Timber upstand built on site | Framed off the deck, insulated, covering dressed up it | New openings, odd sizes, awkward existing roofs | Insulation has to be continuous or the timber becomes the cold bridge |
| Proprietary insulated kerb | A factory-made insulated box fixed to the deck | Standard sizes, warm deck roofs, tight programmes | Comes in set sizes, so the opening is set by the kerb |
| Integral kerb on the unit | The upstand is part of the rooflight and lands on the deck | Replacements, and roofs where headroom is tight inside | Check the height it gives once the covering build-up is on |
| Straight onto the deck | No upstand at all | Almost nowhere on a domestic flat roof | The frame joint sits in the water rather than above it |
The last row exists because people do it. A dome bedded in mastic straight onto a felt deck is still a common sight on 1970s garages, and it is also the commonest source of the phone call that starts with water coming through the ceiling.
What the kerb does besides hold the unit up
It lifts the frame joint clear of standing water and driving spray, which is the part everybody knows. It also gives the roof covering something to be dressed up and terminated against, gives the fixings something solid to go into, and gives the installer a square, true datum to measure the unit from.
That last one is quietly important. The unit is measured off the finished kerb rather than off a drawing, which is why a new opening is two visits with a lead time between them, and why a kerb that is out of square by ten millimetres on a diagonal turns into a reveal that looks wrong from the sofa forever.
Insulating it is not optional
The cold line you cannot see
The rule. The insulation of the roof has to carry on up the kerb without a break and meet the frame, and the vapour control layer has to be turned up and sealed to it. An uninsulated timber kerb is a cold ring around your skylight, and warm room air reaching it condenses on the inside face.
The exception that is not one. On a cold deck the ventilated void above the insulation has to keep ventilating on all four sides of the new opening. Boxing it in with a kerb is the most common cause of damp timber under a rooflight that has never leaked a drop.
Build it or buy it
A site-built timber upstand fits any opening, costs little in materials, and depends entirely on the care taken with the insulation and the vapour layer. A proprietary insulated kerb arrives with that thermal detail already resolved and in a set range of sizes, so the opening gets cut to suit the kerb rather than the other way around.
On a replacement into a sound existing upstand, neither applies and the question becomes whether what is already there can be reused. What each does to the detail is a longer subject and our guide on upstands and kerbs takes it apart properly.
What it costs you in headroom
A kerb is a hundred and fifty millimetres or so of roof build-up standing above the ceiling line, and inside the room that shows as the depth of the reveal. In a single storey extension with a generous ceiling nobody notices. In a low garage conversion or a first floor bathroom it is the difference between a reveal that throws light into the room and a light shaft that swallows it.
Reusing a kerb that is already there
- Height, measured from the finished surface. Not from the deck, and not from the drawing. Ballast and paving count.
- Square and level. Diagonals checked, top surface checked for twist. A kerb that has moved will not take a rigid frame.
- Timber condition. Probed at the corners, where water sits longest and rot starts.
- Insulation and vapour layer. Continuous, or opened up and made continuous while everything is accessible.
- Covering termination. Whether the existing detail can be reused or has to be reformed around the new frame.
Where all five pass, a replacement is a one-day job into the existing kerb. Where they do not, we say which of them failed and what it costs to put right, before anything is ordered.
Related reading
Broadstone and Creekmoor roofs where standard specification is right
Standard specification is the right answer here, and we will say so Most of this site argues that a flat…
Can a flat rooflight be fitted from inside?
Effectively no — not the part that keeps water out. A flat roof rooflight is weathered by dressing the roof…
Can a flat rooflight be fitted to a shed or outbuilding roof?
Yes, and it is usually the simplest work we do Yes. A flat rooflight goes into a garage, workshop, garden…
Can a flat rooflight be retro-fitted to an existing flat roof?
Yes — retro-fitting into an existing flat roof is the majority of this work, not the exception. What decides whether…
Can I fit a flat rooflight to a felt roof?
Yes, and felt is one of the more forgiving coverings to detail Yes. A flat rooflight can be fitted to…
Can two flat rooflights be fitted side by side?
Yes, and it is a common arrangement — but the interesting part is not the two units, it is the…