Are 1990s rooflights on Poole extensions worth replacing now?

The short answer

In most cases yes, and usually not for the reason people expect. A 1990s unit that has misted is finished and there is nothing to discuss. One that has not misted is still a generation behind on the things you notice daily: the noise of rain, the cold surface overhead in January, the condensation on the reveal and the quality of the light. Those are the honest arguments. A dramatic heating saving is not one we will claim.

How a sealed unit fails and mistsA sealed unit holds dry air or argon between two panes, kept dry by desiccant in the spacer bar. Daily heating and cooling pumps the cavity; once the edge seal loses its grip, moist air is drawn in, the desiccant saturates, and the misting that appears between the panes cannot be cleaned because it is on the inside.cavity: dry air or argonspacer with desiccantedge sealmisting sits between the panes, so it cannot be cleaned offmoist air

What went onto these roofs in the 1990s

What was fitted How it was built Where it stands now
Plastic dome on a timber kerb Acrylic or polycarbonate shell, screwed or bedded to a site-built upstand Past its life. Yellowed, noisy and thermally close to nothing
Early flat double-glazed unit Often air filled, plain aluminium spacer, window sealant used overhead Either misted already or losing performance quietly
Pitched roof window Timber sash, factory sealed unit, flashing kit to the tile or slate Frames often sound, units frequently finished. Worth assessing separately
Polycarbonate sheet over a light well Multiwall sheet on bars, sealed with tape and a cover profile Cells fouled, sheet yellowed, the tape long since done

Three things a 1990s unit cannot do

It cannot hold heat to a standard anything fitted now would have to meet, because the gas fill, the coating and the spacer are all a generation behind and, in an air-filled unit, one of them was never there. It cannot keep the inner surface warm enough to stop condensation forming round the edge on a cold morning, because a plain aluminium spacer conducts heat straight round the perimeter. And it cannot control solar gain, so the room under it is hot in July and cold in January, which is the complaint we hear most often about these extensions.

What you actually gain

Quiet is the first thing people notice, and by a distance, particularly where the existing unit is plastic. Rain on a dome is loud, rain on a modern glass unit is barely there. Next is the surface temperature overhead, which changes how a room feels far more than any figure suggests. Then the light itself: clear glass with a modern coating gives a whiter, cleaner light than a yellowed dome or a 1990s tinted unit, and it gives you the sky instead of a glow.

What replacing will not fix

Be clear about what you are buying

It will not fix a cold room. If the extension has uninsulated walls or a thin roof build-up, a new skylight improves one opening and leaves the rest as it was. We would rather tell you that than take the order and let you be disappointed in February.

It will not fix a leak that is coming from the covering. A new unit bedded into a tired roof is work that gets undone when the covering is renewed. Where the covering is near its end, doing both together opens the roof once, and that is the cheaper sequence even though the number is bigger.

Checking yours in ten minutes

  1. Stand underneath at midday and hold a sheet of white paper up. Yellowing in plastic is gradual and nobody notices it happening.
  2. Wipe the inside of the glass. If the haze survives, the unit has failed rather than the room being damp.
  3. Look at the spacer between the panes. A plain metallic bar is the old specification; a darker, non-metallic one is warm edge.
  4. Look for a stamp on the spacer bar and for the toughening mark etched in a corner of the glass, which usually date the unit between them.
  5. Run a finger along the outside of the frame if you can safely reach it. A chalky residue means the coating is at the end of its life.
  6. Look at the reveal below for staining, and at the corners of the frame for gaps you can see daylight through.

Should you wait?

If it has not misted, if the frame is sound and if you are content with how the room feels, waiting is entirely reasonable and we will say so. The thing worth avoiding is waiting until a sale is agreed, because that is the point at which you have the least room to make a sensible decision and the most incentive to accept whoever can come first.

The Poole cohort, and why it fails together

The 1990s extension boom across Poole means this generation of glazing is reaching the end at roughly the same time. On the estates at Canford Heath, Creekmoor, Broadstone and Alderney the limiting factor is normally the material itself, and the plastic domes have simply run out of life. Around the harbour at Hamworthy, Lower Parkstone and Upton, salt has been working on the fixings and the coatings for the whole period, so the frame often fails before the glass does. Out on the spit at Sandbanks the same-age units are frequently long gone, since exposure there shortens the clock rather than lengthening it. And under the pines at Canford Cliffs, blocked drainage channels produce a third pattern again. Same decade, same products, four different reasons for replacing them.

What drives the cost

The size and specification of what goes in, whether the kerb is reusable or needs correcting, whether the covering has to be cut back, how the roof is reached, and whether the work is notifiable. We do not publish prices for any of that and we will not give you a figure over the phone, because four of those five cannot be seen from the ground. What the survey produces is one fixed written price with the glazing and any carpentry or roofing shown as separate lines you can decline.

What we would say at your survey

Which of the four 1990s products you have, what condition its frame and kerb are actually in, whether a glass-only change is possible, what the exposure zone at your address justifies, and whether we think you should do it now or leave it another few years. That last one is an answer we give as often as the other. Our installation work carries a ten-year workmanship guarantee, given directly by us, which is not insurance backed. Ring 01202 923272 or send photographs from inside and above to 447880284133.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272