Vapour control layers, and the damp patch that is not a leak

The damp patch that appears in October and dries in April is usually interstitial condensation at a cut vapour control layer rather than rainwater, and the fix is in the build-up rather than in the sealant.

U-value and g-value pull in opposite directionsU-value measures heat leaving through the unit; g-value measures solar energy coming in. A coating that cuts summer gain also cuts the winter daylight and warmth a room receives, which is why the right answer depends on orientation and on what shades the roof.solar energy ing-valueheat outU-valueglazed unitlowering one usually raises the other

It appears in October and it dries in April

There is a particular sort of damp patch that behaves nothing like a leak. It shows up as the weather turns, spreads slowly over weeks rather than arriving after a storm, sits a little away from the rooflight rather than directly beneath it, and quietly disappears in the spring without anyone doing anything. People spend a great deal of money on sealant chasing it.

It is not rainwater. It is water that was in the air inside the house, that got into the roof build-up, met a cold surface somewhere in the middle of the construction, condensed there, and eventually saturated enough insulation or plasterboard to become visible. The trade name is interstitial condensation — condensation in the interstices, in the gaps between layers — and around a skylight it is one of the commonest faults we are called to that has nothing whatever to do with the glazing.

Two condensations, and only one of them is visible

Which one you have decides everything that follows

Surface condensation forms on a surface you can see and wipe: the pane, the frame, the reveal corner. It is a humidity and surface-temperature problem and it is dealt with on condensation on the inside of the glass.

Interstitial condensation forms inside the construction where nobody can see it, and by the time it is visible it has usually been happening for a season or two. It is an air and vapour movement problem, and no amount of ventilation in the room fixes it if the air is getting into the roof.

The two can coexist, and a house with the first often has the second for exactly the same reason: too much moisture, and a route for it to travel.

What a vapour control layer actually is

A vapour control layer is a sheet on the warm side of the insulation whose job is to stop indoor moisture reaching the cold part of the build-up. That is the description in every specification, and it is slightly misleading, because it understates the more important half of the job.

Moisture moves through a roof two ways. Vapour diffusion is the slow migration of water molecules through solid materials driven by a difference in vapour pressure. Air movement is warm moist indoor air physically blowing through a gap. The second carries vastly more water than the first — a small unsealed lap or an unfilled service hole moves more moisture in a day than diffusion through an entire ceiling does in a season.

So the layer is an air barrier first and a vapour barrier second, and its performance is decided almost entirely by whether it is continuous. A perfectly specified membrane with an untaped lap and four downlight holes in it is not a vapour control layer; it is an expensive sheet of plastic. This is why the specification word that matters on a drawing is not the product name but the word “continuous”, and why the detail around a rooflight kerb — where the layer must be cut and then rejoined — is the part of the job that decides the outcome.

Warm roof, cold roof, and where a rooflight sits in each

Build-up Where the insulation sits Where the vapour control layer goes What it means at the kerb
Warm deck flat roof Above the structural deck, under the waterproofing On top of the deck, immediately under the insulation The layer must be dressed up the full height of the upstand and sealed to the rooflight frame. The commonest place it is simply stopped short
Cold deck flat roof Between the joists, with a ventilated void above it Under the joists, behind the ceiling lining The kerb interrupts the ventilation path as well as the layer. Hard to get right and generally avoided in new work
Inverted or protected membrane roof Above the waterproofing, ballasted The waterproofing itself acts as the vapour control layer Upstand heights grow, and drainage around the rooflight has to work through the insulation layer
Pitched roof, insulation at rafter level Between and under the rafters On the room face of the rafters, behind the plasterboard A roof window frame is set into the rafter plane, so the layer must be returned into the reveal and taped to the frame all round

The row that causes most of the trouble is the first. A warm deck is the sensible build-up for a flat roof extension and it is what most Poole side returns and rear extensions have. It works beautifully as a plane and it is compromised the moment something penetrates it — which a skylight, by definition, does.

Vapour control layers, and the damp patch that is not a leak
A warm-edge unit on a cold morning: clear glass, dry reveal.

The kerb is where the layer gets cut

Picture the sequence on site. The deck goes down, the vapour control layer is laid over it, the kerb is built or set, the insulation goes round it, the waterproofing is dressed up it, the rooflight sits on top. Somewhere in that order the membrane has to stop being a flat sheet and become a three-dimensional detail that climbs a box and terminates against an aluminium frame.

What goes wrong is nearly always one of four things. The layer is cut to the size of the aperture and left at deck level rather than dressed up the kerb, leaving the whole upstand outside the air barrier. It is dressed up but not sealed at the top, so the corner of the kerb is an open slot. The corners are folded rather than formed, and a folded corner in a stiff membrane leaves a pleat that is not sealed to anything. Or the kerb is fitted after the insulation, and the layer is patched in around it afterwards with tape onto a dusty surface that the tape will not hold.

Done properly, the membrane runs up the inside face of the upstand, over its head, and is sealed to the underside of the rooflight frame with a tape or a proprietary collar rated for the job, with formed corners rather than folded ones. It takes an hour. Skipping it takes none, and the consequence arrives eighteen months later as a stain.

Vapour tight inside, vapour open outside

The rule, and the exception that matters

The rule: a build-up should become progressively more vapour open from the inside out, so that any moisture that does get in has an easier path outwards than the path it came in by. The traditional expression of this is that the inner layer should be several times more vapour resistant than the outer.

The exception: a flat roof cannot obey it. The waterproofing on top is, necessarily, the most vapour-tight layer in the construction — it has to be, it keeps the rain out. So moisture that gets into a warm deck has nowhere to go. It condenses on the underside of the waterproofing and stays there.

That is why a flat roof is unforgiving in a way a pitched roof is not, and why the vapour control layer under a flat roof rooflight is not a belt-and-braces refinement. It is the only defence the build-up has.

Telling it from a leak

Evidence Points to rainwater Points to interstitial condensation
Timing Follows rain, especially wind-driven rain from a particular direction. Can happen in July Follows cold weather. Worst in a dry, cold snap. Absent all summer
Onset Appears within hours of the weather and often runs Creeps outward over weeks and rarely runs
Position Usually traceable to a point — a lap, a fixing, a flashing upstand Diffuse, often offset from the rooflight, frequently at the coldest line in the ceiling
The water itself May be dirty, may carry staining from the build-up it passed through Clean, and the staining is from the plasterboard rather than in the water
Response to a hose test Reproducible, given patience and a methodical sequence Nothing happens, which is the most useful result the test can give you
Response to a dehumidifier No effect Usually improves, sometimes markedly, because the source is indoor air

The hose test deserves its place in that list. Run methodically, from the lowest point upwards, in sections, with long enough between sections to see a result, a negative hose test is strong evidence and it costs an afternoon. A leak at a rooflight kerb that will not reproduce under a hose is usually not a leak at all — and the ways one genuinely does get in are set out on the failed and misted rooflight pages.

Vapour control layers, and the damp patch that is not a leak
The kerb is measured before anything is ordered.

The details that pass more moisture than the membrane ever does

  1. Recessed downlights in the reveal or the adjacent ceiling. Each one is a deliberate hole through the air barrier, placed at the warmest, wettest, highest point in the room. Use surface-mounted fittings or a sealed, gasketed type.
  2. The perimeter of the plasterboard. Where the ceiling meets the wall, and where it meets the reveal lining, the board is rarely sealed. Air takes the path.
  3. Service penetrations. Extract ducts, cables, a soil vent pipe, a boiler flue passing the roof plane. Each needs a collar and tape, not expanding foam.
  4. Untaped membrane laps. An overlap is not a seal. The specification will name a tape; site will run out of it on a Friday.
  5. The junction where an extension roof meets the original house. Two build-ups, two air barriers, and frequently no thought about how they join. This is the single detail we find unresolved most often.

Purbeck, Portland and the roofs where a cold deck is not an option

On heritage roofs across the Purbeck area, construction depth is the constraint that decides the build-up. Purbeck stone slates are heavy, thick and irregular, the rafters were sized for them, and there is often no room to add insulation at rafter level without either losing the ceiling height or raising the roof plane — and raising the plane on a visible slope in Corfe Castle, Langton Matravers or Swanage is a planning question decided by Dorset Council on merit, never a foregone conclusion.

The same squeeze appears on flat roofs in conservation areas around Poole Old Town and the Quay, where a parapet height fixes the total build-up depth available. A warm deck needs its insulation thickness; if the parapet will not allow it, the temptation is a cold deck, and a cold deck that cannot be properly cross-ventilated is worse than no strategy at all.

Where the depth genuinely is not there, the honest answers are a thinner high-performance insulation, a redesigned upstand, or accepting a lower thermal standard and saying so to building control — not a cold roof that cannot breathe. We will tell you which of those your roof is, and which authority decides it.

What we detail, and what gets notified

Every rooflight we install gets a stated vapour control strategy on the quotation: which layer is the air barrier, how it is carried up the kerb, how it terminates at the frame, and what tape or collar makes the junction. Where we are fitting into someone else’s roof build-up and cannot see what is under the deck, we say that too, in writing, rather than assuming.

Moisture in a roof is covered by the approved documents on resistance to moisture and on ventilation, and where the work is notifiable it is signed off by BCP Council, Dorset Council or New Forest District Council depending on where in the service area the roof is. The edition current on the day governs, and building control assesses each case on its own merits.

Our installation work carries a ten-year workmanship guarantee, stated plainly as a workmanship guarantee and not insurance backed, with a fixed written price after survey. If you have a stain that comes back every autumn and goes away every spring, ring 01202 923272 before buying any more sealant — and a skylight is very likely not the thing that needs replacing.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272