Routing a tunnel through a loft full of services and storage
How a tunnel route is found between two fixed points in a loft already occupied by structure, services and storage, and which of the two ends gives way when they cannot be reconciled.
A sun tunnel route is the answer to a geometry problem with two fixed points and a loft full of things that were there first. Most of the survey is spent finding out which of those two points is willing to move.
Almost every disappointing tunnel was routed on fitting day rather than at survey. This page is what a proper route-finding exercise looks like, in the order it happens, and what each obstruction up there actually costs you.
Two fixed points that were chosen by different people
The ceiling position is chosen by the room. It wants to be where the light is needed, which on a landing means over the circulation space rather than tucked against a wall, and in a bathroom means away from where someone stands looking in a mirror.
The roof position is chosen by the roof. It wants a clear tile or slate field away from a valley, a hip, a chimney, a vent, an abutment and the shadow of anything taller. It also wants the plane that sees the most sky, which around Poole is frequently not the plane closest to the room.
Those two wishes are rarely in a straight line with each other. The route is the negotiation, and the loft is where it is conducted.
What is actually up there
| Obstruction | What it rules out | Usual resolution |
|---|---|---|
| Ceiling joists | A diffuser that spans two bays | Centre the opening in a bay, or trim the joist properly |
| Rafters and battens | A dome positioned between fixed centres | Roof opening set out to suit rafter spacing |
| Purlin or binder | A straight diagonal run across the void | Route over or under it, adding deflection |
| Truss webs | Most rigid routes in a post-war roof | Find a clear triangle, or accept a flexible offset |
| Cold water tank | The centre of the void, usually over the landing | Route around; never relocate a tank to suit a tunnel |
| Soil vent pipe | The run between a bathroom and the ridge | Cross it at a different level, keeping clearances |
| Cables and junction boxes | Nothing outright, but they must stay accessible | Re-clip clear of the tunnel, by an electrician |
| Extract ducting | Sharing the shortest path out of a bathroom | Whichever has less freedom wins; usually the duct |
| Boarded storage deck | Free choice of route, and it hides everything | Lift boards at survey, not on fitting day |
The last row is the one that causes the most trouble. A boarded loft with boxes on it is a loft nobody has fully seen, including the owner. A survey that does not lift boards is a survey that will be revised.
The order the route is worked out in
- Stand in the room and mark the ceiling. Ideal position first, before any constraint is applied, so everyone knows what is being traded away later.
- Find that point from above. Measure from a known wall, not by eye. A landing looks different from the hatch than it does from the stairs.
- Establish the bay. Joist direction and centres decide whether the ceiling opening lands where it was marked or half a bay across.
- Choose roof candidates. Clear areas of covering with the best view of open sky, checking for chimney, vent and tree shadow at the times of year that matter.
- Draw the straight line and then break it. Trace it in the loft. Note every timber and service it hits and how far the run has to deviate for each.
- Count the deflections. Every turn is a cost. If the count climbs past a couple of meaningful turns, one of the two end points needs to move.
- Move the end that can move. Usually the roof end, sometimes the ceiling position by half a metre, occasionally both.
- Check the diameter survives the route. A bigger tube needs a wider clear path, and the tightest point on the route sets the maximum size.
- Write it down. Positions, diameter, tube type, number of turns and the exposure zone that governs the flashing and dome specification.
Joists, and the temptation to cut one
A tunnel arriving in a ceiling has to pass between joists. Standard centres and standard tube diameters are broadly compatible by design, which is why a modest tunnel will often drop neatly into a bay with nothing structural touched.
Go up a diameter and it may not. At that point there are three honest options: move the position to where the bay allows it, accept the smaller tube, or trim the joist with proper trimmers so the load goes round the opening. The dishonest fourth option, cutting through a joist and leaving it, is how ceilings crack and is not something we will do or leave behind.
On the roof side the same logic applies to rafters. The dome opening is set out to suit the rafter spacing you have, because the alternative is cutting structure that is carrying the roof.

Water tanks, and why the tunnel gives way
A Poole-specific detail worth knowing before the survey
Many 1930s and post-war houses around Parkstone, Winton and Penn Hill still carry a cold water storage tank sitting squarely over the landing — which is exactly where a hallway or landing tunnel wants to go, because that is where the ceiling needs light. The tank is supported on bearers spreading load across joists, and it is full.
The tunnel moves, not the tank. Relocating stored water is plumbing and structural work with consequences well beyond daylight, and nobody should be offering it as part of a skylight job. Where the tank genuinely blocks every route, the honest answer is a different ceiling position, a different room, or a rooflight over the stairwell if the roof plane allows one.
Services you must not simply move
Some things in a loft can be re-clipped out of the way by the right trade. Others cannot be touched by us at all. Electrical cables can be re-routed, but by an electrician, and junction boxes must remain accessible afterwards rather than being buried behind a tube. Anything gas-related is not ours to move under any circumstances.
Soil and vent pipes stay where they are. Mechanical extract ducting from a bathroom or utility can sometimes be re-run, but the duct usually has less freedom than the tunnel does, because its route is governed by fall, length limits and where it terminates.
What we will do is identify every one of these at survey and say plainly which trade is needed, so you are not discovering a second contractor halfway through a day’s work.
Insulation, boards and the storage you still want
A tunnel crossing a loft has to coexist with what the loft is for. Where there is a boarded deck, the tube either passes above it or the deck is locally cut and made good around the run, and either way the result should still be walkable and still be storage.
Insulation is the more important half. The tube passes through the insulated layer and becomes a cold surface running from a cold void into a warm room, which is why the run is sleeved and the ceiling junction sealed. That is a subject in its own right and it is covered properly in condensation and the insulation sleeve. For routing purposes the point is simply this: a route that leaves no room to insulate around the tube is not a finished route.

When the route says no
The answer we give more often than people expect
If the room has its own roof plane, the route problem is usually telling you to fit a rooflight instead. A tunnel exists to reach rooms that have no roof above them — internal bathrooms, landings, en-suites, utilities, windowless stairwells. When a route demands three turns, four metres and a joist trimmed to get light into a room that has rafters directly over its ceiling, the tunnel has stopped being the clever solution and become the awkward one.
We would rather lose a tunnel sale and fit the right product. A skylight in that ceiling delivers more daylight, gives a view of sky, and removes the whole routing exercise. Where no roof plane exists, the tunnel is genuinely the only option and the routing work is worth doing properly.
What you get in writing
The survey produces a route, not an intention. That means marked positions at both ends, the tube type and diameter, the number and location of turns, what has to be trimmed and by whom, which services need another trade, and the exposure zone that sets the flashing and dome specification — the salt-laden spit at Sandbanks and sheltered Canford Heath do not get the same materials, and we say which yours is.
That goes on a fixed written price after survey. Workmanship carries a ten-year guarantee, which is our own and is not insurance backed. To have a loft properly looked at, including under the boards, ring 01202 923272.
Related reading
1930s Poole semis with internal bathrooms and no wall to reach
The interwar semi built across Parkstone, Winton, Penn Hill and Oakdale has a recognisable problem: a bathroom in the middle…
Adding a light kit so the tunnel works after dark
A sun tunnel goes dark when the sky does. In a bathroom or a hall that had no daylight at…
Are sun tunnels warm or do they lose heat?
A sun tunnel is a hole through your insulated ceiling, so yes, it loses some heat — and a properly…
Broadstone bungalows where the loft void is shallow and wide
Broadstone, Creekmoor and the bungalow runs out towards Corfe Mullen were built low and built wide. Every room sits on…
Can a sun tunnel be fitted in a bathroom?
Yes. A windowless internal bathroom or en-suite is the single most common place a sun tunnel earns its keep, and…
Can a sun tunnel be fitted into a Purbeck stone slate roof?
Yes, but not with a kit. Purbeck stone slates are thick, heavy and laid in diminishing courses, and there is…