The dome lifts off in minutes; the work is in the upstand, the old fixings and the covering that was dressed against a shape nothing current matches.
A dome is usually the easiest thing on a roof to take off and the most awkward thing to leave behind. The dome itself comes away in minutes. What stays is an upstand built to 1980s or 1990s practice, a ring of tired fixing holes, a bed of sealant that set hard some time in the last century, and a roof covering dressed up against a shape nothing currently made will match.
So most of the work in a dome replacement happens after the dome is in the skip. This guide covers that part: what is holding an old dome down, how to get it off without tearing the covering around it, what tends to be underneath, and the honest ways of closing the kerb once the hole is open. If what you want is the case for swapping a dome for flat glass at all, that argument sits on its own page; this one starts from the decision already taken.
What is actually holding it down
There is no single detail. Domes were fitted over four decades by glaziers, roofers and builders, each using what was normal to their trade, and the fixing arrangement decides how the removal goes far more than the age does.
| Arrangement | How it was done | What it means on removal |
|---|---|---|
| Screwed through the flange | A flat flange round the dome, screwed down into the top of the timber upstand | The kindest case. Screws back out, flange lifts, the kerb top is intact underneath |
| Bedded in mastic only | A bead of solvent mastic between flange and kerb, relying on adhesion and gravity | Comes away with a knife round the perimeter. The residue is the problem, not the dome |
| Two-part plastic upstand | A moulded plastic kerb section with the dome clipped or screwed onto it | The plastic section usually comes off too, and the timber below it is an unknown until it does |
| Covering dressed over the flange | Felt or single-ply lapped up and over the dome flange and sealed down onto it | The covering has to be cut back before anything lifts, which turns this into roofing work |
| Bitumen bedded | The flange sat into hot or cold applied bitumen, often with a further layer over the top | Nothing separates cleanly. Expect to renew a band of covering all the way round |
The first two come off in a morning. The last two mean the opening and a margin of roof around it are both being rebuilt, and that has to be known before a price is given rather than discovered on the day.
The half hour before anything is unscrewed
An open roof is a liability, so nothing is disturbed until the replacement is on site, the forecast holds and the room below is covered. A dome removal drops grit, dried sealant, old insulation and sometimes forty years of accumulated dust straight down onto whatever is beneath it, which on an extension is usually a kitchen. Boards go over worktops, sheeting over the floor, and anything that cannot be moved is covered rather than dodged.
We also check from inside where the ceiling finishes against the opening, because a plasterboard reveal fixed to the inner face of the kerb dictates how much of the upstand can be touched before the room needs making good as well as the roof.
Getting it off without tearing the covering
- Cut the perimeter sealant line first, with a blade run flat against the flange, so the dome is not being levered against adhesion it might win.
- Back out every fixing before lifting anything. One screw missed in a corner turns a lift into a tear, and the tear runs into the covering.
- Lift the dome vertically and away, not by pivoting it on one edge, which is what pulls the covering up with the flange.
- Scrape the kerb top back to sound material rather than to clean timber. Old bedding compound that is bonded and stable can be dressed flat; anything soft comes off.
- Sound the upstand all round with a screwdriver, particularly the low corners and anywhere the covering was previously patched, and mark the soft areas before they are forgotten.
- Get a temporary cover over the opening, mechanically held rather than weighted, and leave the roof safe even if the intention is to glaze the same hour.
What you find underneath
Three things, most of the time. First, a timber upstand of whatever section the joists allowed, usually lower than anything would be built to now, and frequently with no insulation round it at all. Second, an old fixing pattern, often into end grain at the corners, where the screws have been working in an enlarged hole for years. Third, the actual fall, which on a dome opening was rarely thought about because a dome sheds in every direction by its shape and forgives a kerb that a flat unit will not.
That last point is the one that catches people out. A dome will sit happily on an upstand whose top surface has drifted out of level, because water runs off its curve regardless. Put a flat skylight on the same kerb and the low corner holds a puddle against the perimeter seal for the rest of its life.

Old bitumen, old mastic, and what we do not cut into
The rule, and where we stop
The rule. Old bedding material that is hard, bonded and dry is dressed back and built over. There is nothing to gain from chasing every trace of 1980s mastic off a timber top that is about to be capped anyway, and a great deal to lose from gouging the kerb while trying.
Where we stop. Some materials used in roofs before 2000, including certain bitumen products, boards and mastics, can contain asbestos. We do not identify that by eye and neither should anyone else. Where the build-up looks suspect, work stops and the material is tested by someone qualified to do it before anything is cut, drilled or broken out. That is not a sales position, it is the only lawful way to proceed, and it is one of the reasons we would rather open a small inspection area at survey than meet a surprise with a roof already half off.
The four ways to close the kerb
Once the dome is gone the opening has to be finished in one of four ways, and the right one depends on the state of the timber rather than on preference.
| Route | When it applies | What the work involves |
|---|---|---|
| Reuse and dress | Upstand square, sound, tall enough and insulated | Clean the top, renew the bedding, set the new unit down. Roofing barely disturbed |
| Re-top | Sound below, but the top surface is twisted, notched or chewed by old fixings | A new top frame built onto the existing upstand, levelled and insulated, covering dressed up to it |
| Rebuild | Soft timber, rot at the corners, or a deck that has gone under the perimeter | The upstand comes out to the deck and is rebuilt. This is carpentry and roofing, priced as such |
| Deck over | The opening is not being reglazed at all | Joists trimmed in, deck and insulation made continuous, covering run through, ceiling closed below |
Re-topping a sound upstand
Re-topping is the route people have not usually heard of and it resolves most of the awkward cases. The body of the upstand stays where it is, tied into the deck exactly as it was built, and a new frame is formed on top of it: levelled across both diagonals, insulated round the outside, and brought up to a height that suits the exposure. The covering is then dressed up the new face and terminated properly instead of being asked to seal against a chamfered forty-year-old edge.
It gains you three things at once. The unit lands on a true surface, the old fixing holes are buried rather than reused, and the upstand height becomes a decision rather than an inheritance.
Making the covering good around it
Whatever route is taken, the covering has to be terminated at the upstand in a way that belongs to that covering. Felt is lapped and bonded up the face and finished under the new detail. Single-ply is welded up and capped. Liquid systems are taken up and reinforced at the angle. None of them is a bead of sealant, which is the commonest thing found at a failed dome opening and the reason removal so often reveals wet deck.
Where a covering is close to the end of its own life, doing the opening and the covering together is nearly always the better answer, because it opens the roof once. We will say when we think that is the case and we will price it separately so the decision stays yours.

Closing the opening for good
Sometimes the honest answer is that the dome is not replaced. A landing lit by a modern rooflight elsewhere, a garage conversion, a room where the dome always caused more glare and heat than it was worth: all reasonable reasons to lose the opening.
- Trim the opening properly with new joists spanning to the existing structure, not with noggins packed into the old frame.
- Continue the deck across at the same level so no step is built into the finished surface.
- Bring the insulation through unbroken, because a patch of thin build-up over a warm room is where the next condensation problem starts.
- Run the covering through the area as a continuous detail, lapped to the original in the direction water actually travels.
- Close the ceiling below and leave a cut line that a decorator can finish, rather than a hole filled level with the surrounding board.
Where this comes up across Poole
The dome cohort here is a 1970s to 1990s extension cohort, and it is failing on a fairly tight timetable. Estate extensions at Canford Heath, Creekmoor, Broadstone and Alderney carry the plainest version: a single dome over a kitchen or a bathroom, on a site-built timber upstand, on a felt roof. Around the harbour at Hamworthy and Lower Parkstone the same detail has had salt on it for the whole of that time, so the fixings and any steel in the assembly are further along than the timber is. Out on the spit at Sandbanks the upstands themselves are often the limiting factor, because driven rain with no fetch break goes up an upstand as readily as it lands on a roof, and a height that was quietly adequate inland never was there. We name the exposure zone before deciding a kerb height, and where the inland answer is simply the ordinary one we say so rather than selling marine specification into a heathland back garden.
What drives the cost, and what you get in writing
We do not publish prices for this work, and any firm quoting a dome replacement over the phone is quoting a guess. What we can tell you plainly is what moves it: which of the four routes the kerb needs, whether the covering has to be cut back and renewed around the opening, how the roof is reached, whether the ceiling below is being disturbed, and the size and specification of the replacement rooflight itself. Four of those five are unknown until somebody has stood on the roof and sounded the upstand.
What the survey produces is a single fixed written price with the glazing, the kerb work and any roofing shown as separate lines, so you can see what you are being asked to pay for and decline any part of it. Our installation work carries a ten-year workmanship guarantee given directly by us, which is not insurance backed. If you have a dome that has gone milky, cracked or simply cold, ring 01202 923272, or send photographs of it from inside and out to 447880284133 and we will tell you which route it is likely to be before anyone visits.
Related reading
Are 1990s rooflights on Poole extensions worth replacing now?
In most cases yes, and usually not for the reason people expect. A 1990s unit that has misted is finished…
Can a leaking rooflight be resealed instead of replaced?
Sometimes, where the leak is at a gasket, a termination or a joint that can genuinely be renewed. But the…
Can a misted rooflight be repaired?
Sometimes, but not in the way most people mean. The misting itself cannot be cured, because the fault is inside…
Can a misted unit be replaced with a larger one?
Yes, and it is often worth doing while the roof is open. But be clear what you are agreeing to:…
Can a rooflight be replaced in one day?
The fitting usually is, yes. One rooflight, on a roof that can be reached, onto a kerb that turns out…
Can an old dome rooflight be swapped for flat glass?
Yes, and it is one of the replacements people are most pleased with afterwards. The work is usually straightforward, because…