Section through a rooflight kerb on a flat roofThe unit sits on an insulated kerb standing proud of the finished roof surface. The covering is dressed up the kerb face and terminated under the frame, so water meeting the kerb runs away down the fall rather than under the unit.glazed unitinsulated kerbcovering dressed up the facedeck and insulationfallwater runs away, not under

Two words for the same job, and they are not the same thing

Every flat roof rooflight sits on something. The glass never lands on the deck, because a unit bedded flat onto a membrane has nowhere to shed water to and no way of keeping the covering above the wet line. So a frame is raised around the opening, the roof covering is carried up the outside of it, and the glazed unit lands on the top. That raised frame is the part the whole installation depends on, and there are two ways to get one.

A timber upstand is built on site out of treated softwood and a sheet facing, framed off the trimmers around the opening. A proprietary kerb arrives on the lorry with the rooflight, made to the unit’s dimensions, insulated inside its own construction and square before anyone touches it. Homeowners searching for a flat skylight rarely see either word on a quote until they ask what the glass is standing on, and by then the decision has usually been made for them.

It is worth having an opinion about, because almost everything that goes wrong on a flat glazed unit goes wrong at this joint rather than in the glass.

How a timber upstand is actually built

The sequence matters more than the material. A timber upstand is not a box dropped over a hole; it is framed off the structure that the opening was trimmed into, so that the load of the glass and the wind trying to lift it both travel into joists rather than into deck boards.

  1. The opening is trimmed. Joists cut back, trimmers doubled where the span demands it, so the hole is bounded by structure and not by a sawn edge of decking.
  2. A sole plate is fixed down onto the trimmers, following the opening, and this is the piece the uplift resistance is eventually hanging from.
  3. The upstand is framed up from that plate to the height the covering and the fall require, with corner posts and noggins so nothing can rack.
  4. It is sheathed — plywood or OSB, or solid timber — to give the covering a continuous face to be dressed against, with no gaps for a membrane to bridge unsupported.
  5. Insulation is added outside or within, so the timber does not become a continuous cold path from deck to glass. That detail deserves its own page and gets one elsewhere in this set.
  6. The top is capped and checked for square, plumb, twist and fall, before the covering goes anywhere near it. This is the last moment the shape can be corrected cheaply.

Every one of those steps is an opportunity. A kerb four millimetres out of square across a 1200mm opening will still take a membrane and still look finished, and will then hold a glazing gasket at uneven compression for the rest of its life.

What a proprietary kerb brings out of its packaging

A proprietary kerb is made to the same tolerance as the rooflight that sits on it, because in most cases it is made by the same firm to suit that unit. It typically arrives as an insulated box — a rigid core with a weatherable outer face, sometimes a bonded flange for the covering, sometimes a pre-formed fall built into the top.

What you are buying is not timber replaced by plastic. You are buying the removal of several decisions from site: the height is already right for the unit, the top is already square and already pitched if you ordered it that way, the thermal path through the kerb has been designed rather than improvised, and the frame seats on a face that was machined rather than cut on a roof in the wind.

The cost of that is rigidity of another kind. The kerb is sized to one opening. If the hole comes out 30mm different from the drawing, a carpenter can adjust a timber upstand that afternoon and a proprietary kerb goes back on a lorry.

The decision in one table

What it affects Site-built timber upstand Proprietary insulated kerb Which way it pushes the choice
Dimensional accuracy As good as the carpenter and the weather on the day Factory square, matched to the unit Large panes and slim frames punish error, so the bigger the glass the stronger the case for proprietary
Thermal path Depends entirely on insulation added on site Designed into the section Proprietary, unless the timber detail is drawn and specified rather than assumed
Non-standard openings Built to whatever the roof turns out to be Made to the order, and only to the order Timber, on old roofs where the opening cannot be predicted until it is open
Lead time Built the same day the opening is formed Runs with the unit, from the measure rather than the order Timber, where the roof cannot be left open waiting
Replacing the glass in twenty years Any unit that fits the aperture can be made to suit Best matched by the same range, which may no longer exist A real point for timber, and one nobody raises at quotation stage
Cost shape Cheaper in materials, dearer in hours and in risk Dearer as a line item, with fewer ways to be wrong Judge it against the cost of getting the kerb wrong, not against the material price

There is no universally correct answer in that table, which is why we will not pretend to one. What there is, on any given roof, is a reason — and the reason should be on the quote in words you can argue with.

Timber upstand or proprietary kerb: what each does to the detail
Two smaller units often beat one large pane on a domestic deck span.

Height: the number that keeps coming back

The rule, and the three exceptions to it

The rule: the waterproofing should be carried at least 150mm up the outside of the upstand, measured from the finished roof surface — the top of the covering, not the top of the deck. Below that, wind-driven rain and short-term ponding start testing a joint that was never intended to be under water.

Exception one — anything laid over the covering. Ballast, paving, a green roof build-up or decking all raise the finished surface, and the 150mm is measured from the new top, not from the membrane hiding underneath it.

Exception two — headroom that will not allow it. On a shallow extension with a low ceiling, a full-height kerb can look absurd from inside. The height can sometimes be reduced, but only against a drainage design that guarantees water leaves rather than gathers, and only with the trade-off explained rather than buried.

Exception three — the upslope face. Where the roof falls towards the rooflight, the effective height on that side is smaller than the tape says, because water arrives there first and deepest. That face often needs more, not less.

Square, plumb and twist — the three checks before any covering

A glazed unit is rigid. It cannot take up an error, and a rooflight frame will not flex to suit a kerb that is 6mm wider at one end. What happens instead is that the gasket compresses hard on one corner and lightly on the opposite one. It will still be weathertight when it is handed over. It will be a slow leak in the fourth or fifth winter, when the light compression side has taken enough thermal movement to open a hairline path.

Twist is the one people miss. An upstand can be perfectly square in plan and perfectly plumb on every face and still not have all four top corners in the same plane, and a straightedge across the diagonals is the only way to find it. That check costs two minutes on a kerb and a day on a glass unit that has already been craned into place.

How the kerb is held down, and what it is held down to

Wind lifts a flat roof rather than pressing on it, and the load path runs up through the glass, into the frame, into the kerb and then into whatever the kerb is fixed to. That last joint is where we see the most casual work: screws into a deck board that is itself only nailed down, rather than into the trimmers that actually span.

Deck type What the kerb should be fixed into What we check before fixing
Timber joist and deck Trimmers and joists, through the deck, not the deck alone That the trimmers are sound and doubled where the opening is wide
Concrete or screed deck Mechanical anchors into sound concrete, with a bearing plate Depth of sound material and whether screed is hiding a weak surface layer
Profiled metal deck A frame spanning to the purlins, never the deck crowns alone Direction of the profile against the direction of the opening
Old bituminous build-up over boards Structure exposed and assessed first, then fixed as for timber Whether the boarding is chipboard that has been damp for a decade

The fixing grade is a separate question, and on this coastline it is not a small one. What the spit at the harbour mouth does to a standard fixing is covered in the wind uplift guide in this set.

Timber upstand or proprietary kerb: what each does to the detail
Ponding beside a kerb. A flat roof is never flat, and this is what a lost fall looks like.

Where each one wins across the Poole patch

The same choice resolves differently four miles apart. On a 1960s flat-roofed extension in Broadstone or Creekmoor, sheltered, standard construction, a well-built and properly insulated timber upstand is entirely right and a proprietary kerb is money spent on a problem the address does not have. Out on the Sandbanks spit, where salt arrives with no fetch break and every joint is being worked by wind off open water on both sides, the factory-made, factory-square, thermally designed option earns its price. In Canford Cliffs and Branksome Park the deciding factor is neither: it is pine debris and the drainage it fouls, which pushes us towards a kerb with a built-in fall whichever way it is made.

What the survey settles about the kerb

  1. What is there now. On a replacement, whether the existing upstand is sound, the right height, and square enough to reuse — which is often the single biggest number on the quote.
  2. The deck build-up. Warm, cold or inverted, and what the covering sits on, because that decides how the kerb is fixed and where the insulation line runs.
  3. The opening. Measured, and measured again once it is open on an older roof, because the drawing and the roof disagree more often than not.
  4. Which kerb, and the reason. Named on the quote — timber or proprietary, the height, where the fall is coming from, and why that choice suits this roof.
  5. The covering interface. What the roof is finished in and how that membrane will be turned up the face, since felt, single ply and GRP each ask something different of the same kerb.

What we will put in writing

Stated plainly

A fixed written price after survey, with the kerb specified by type and height rather than absorbed into a single figure for “rooflight fitted”.

A ten-year workmanship guarantee on our installation. It is a workmanship guarantee and it is not insurance backed, which we say in plain words rather than leaving you to discover it.

If you are weighing up a flat rooflight or skylight on an extension anywhere between Wimborne and Swanage and want to know which kerb your roof actually calls for, ring 01202 923272 and we will tell you before anyone measures anything.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272