Rooflight and Skylight Installation Charminster

Rooflight and skylight installation in Charminster, Bournemouth, where most roofs have already been converted once and the existing dormer decides what is left to work with.

ZoneSpecified by exposure
10 yrWorkmanship guarantee
BCPNotification handled
Roofs and exposure around Rooflight and Skylight Installation Charminster
Four miles inland the same roof is an ordinary one, and marine-grade is an overcharge.
Roofs and exposure around Rooflight and Skylight Installation Charminster
Four miles inland the same roof is an ordinary one, and marine-grade is an overcharge.
Exposure zones across the Poole service areaExposure changes within about four miles. The harbour mouth and the spit take salt-laden wind with no fetch break; the Quay and Old Town are sheltered by the land behind them; the wooded cliffs add debris and canopy; inland is ordinary exposure where a marine specification is an overcharge.spitharbourwooded cliffinlandmost aggressiveordinaryabout four miles changes the specification

First, which Charminster

There are two, and they are twenty-five miles apart. This page is about Charminster in Bournemouth — the dense grid of streets north of the town centre either side of Charminster Road, with Queen’s Park at its eastern edge. The other Charminster is a village on the Cerne just outside Dorchester, and almost nothing on this page applies to it. The difference is not pedantry: the Bournemouth suburb is under BCP Council, the Dorchester village is under Dorset Council, the village core carries heritage constraints that these streets do not, and the roofs are built of different things. We work in both. We quote them completely differently, and the first question at the survey is which one you are standing in.

Assuming you are in the Bournemouth one, the rest of this page is about a suburb where a great many roofs have already been altered once, and where that fact shapes almost every enquiry we take.

The skyline here has already been converted

Walk any of the roads off Charminster Road and look at the back of the houses rather than the front. Rear dormers, one after another, most of them added over the last forty years, a lot of them in the nineties and two-thousands. The Edwardian and late Victorian terraces and semis here have deep roofs and generous ridge heights, and the lofts were converted early and often — for extra bedrooms in family houses, and for extra lettable rooms in the many houses that are let.

That changes the enquiry. In most of Poole, somebody asking about a rooflight has an untouched roof. In Charminster, more often than not, there is already a dormer up there, and the useful question is not "where does a skylight go" but "what is left to work with, and is a rooflight even the right tool now".

If you already have a rear dormer Is a rooflight sensible? What we look at
In the slope beside or above the dormer Often yes — this is the best remaining option and it brings light to the part of the room the dormer does not reach How much clear slope is left, the position of the trimming timbers put in when the dormer was built, and the head height inside
In the front slope Frequently yes, and it is the standard way to light the front half of a converted loft The ordinary limits apply — nothing more than 150mm proud of the existing slope and nothing above the ridge line — and on a terrace of matching frontages anything standing proud is noticeable from the pavement
In the dormer’s own flat roof Usually not, and this is the request we most often talk people out of Fall, area and upstand height — the reasons are in the panel below
Replacing the dormer’s existing windows Different trade. Those are vertical windows in a timber cheek and we do not fit them Nothing — we will say so rather than take the work

Why a rooflight in a dormer roof is usually the wrong idea

The rule, and the case where it does work

The rule: a dormer roof is a very small flat roof with very little fall, often built to the minimum that would drain, and frequently covered in lead, felt or a single-ply sheet laid by whoever built the dormer. Dropping a kerbed rooflight into it takes out a meaningful share of the total area, leaves narrow channels of covering around the kerb where water has to find its way past, and puts an upstand into a roof whose fall was never generous enough to cope with an obstruction. Ponding against a kerb is how these fail, and they fail slowly and invisibly into a ceiling that has a bedroom under it.

Where it does work: on a larger dormer roof with a genuine fall, a sound deck, and enough clear width each side of the kerb for water to get away. That is a survey judgement made on the roof with a level, not a decision made from the ground. When the answer is yes we will say so; when it is no, the honest alternative is usually a unit in the remaining pitched slope instead.

The loft room that was never signed off

A lot of the conversions around here are old, and a proportion of them have no paperwork behind them at all. That matters when you come to add a rooflight, and it matters more when you come to sell.

A new skylight does not make an unapproved loft room approved. Building Control looks at the whole altered structure, not only at the hole we are cutting. If the room was converted without approval, the floor structure, the stair, the fire separation and the means of escape are all questions that exist whether or not a rooflight is added, and a rooflight application can be the thing that puts them on the record. That is not a reason to avoid doing it properly — a regularisation route exists for work done without approval, and a room with paperwork is worth more than one without. It is a reason for us to say at survey that we have seen a room whose status is unclear, rather than to fit a unit into it and leave the subject alone. Where a loft window is also serving as the escape opening from a converted room, that is a separate specification question covered on the Southbourne page.

When the house is let, and when it is shared

Charminster has a high proportion of rented property, from whole houses let to one household to buildings divided into flats and larger houses let room by room. Every one of those changes who instructs the work, and one of them changes what the work is allowed to produce.

Four positions

Owner-occupier, freehold house. Straightforward. Your roof, subject to planning and Building Control.

Leasehold flat. The roof is almost certainly the freeholder’s, and householder permitted development rights do not extend to flats. Written consent before an order, not after.

Landlord of a whole house. Fine, and common here. We survey the building as it stands rather than as the file describes it, because let houses collect undocumented alterations.

A licensed house in multiple occupation. Larger shared houses require a licence from BCP Council and the licence conditions bear on room sizes and facilities. If the point of the work is to create or improve a lettable room, whether that room counts, and what it does to the licence, is a question for the council’s housing team before anything is built — not a question for a glazing quotation.

Tenant. We cannot take the instruction, however reasonable the request. The owner commissions work to the building.

What the roofs themselves are

Under the alterations, the stock is fairly consistent: cut roofs with purlins, built for slate and in many cases re-covered since with concrete tile, moderate to steep pitches, and rear back-additions with a valley where they meet the main roof. Steep pitches are good news for a rooflight — water leaves quickly, most units are well inside their minimum pitch, and the head height inside a converted loft is usually workable.

The recurring hazard is the valley. Where the rear wing meets the main roof there is a gutter carrying water off two slopes, sometimes off the neighbour’s arrangement as well, and on a house of this age it may be lead, a later liner, or a patch job by somebody in a hurry. A unit set too close to it leaves the flashing nowhere to discharge, and that is the single most common cause of a rooflight in a street like this leaking within its first year. We look at the valley before agreeing a position, and sometimes the honest answer is that the window goes somewhere else.

Exposure, stated and then dropped

Charminster is inland suburban. There is a mile or so of dense town between these roofs and the sea, the salt load is not a factor, and we specify standard architectural coatings and standard fixings. Nobody here should be paying for a marine build-up, and if a quotation includes one, ask which exposure condition it is protecting against and expect a vague answer.

Where the money is better spent on a roof like this is in three places: a properly trimmed and squared opening so the unit seats without packing; an insulated reveal, because an uninsulated timber liner is a cold bridge running the whole perimeter and produces winter condensation that gets reported as a leak; and, on a south or west-facing slope over a room that is already warm, solar control glazing rather than another blind.

How the work runs

  1. What is already up there. Existing dormer, existing conversion, existing paperwork — established before we discuss a product.
  2. Inside the roof. Rafter and purlin positions, trimming from any previous conversion, valley condition, and head height at the proposed position.
  3. Consent chain identified. Freeholder, managing agent, or the housing team at BCP Council where a licence is in play.
  4. Access agreed. Scaffold or tower, the route in through the house where there is no side gate, and protection to the floors on that route.
  5. Building Control through BCP or an approved inspector, with anything we have seen that affects the wider conversion stated in writing rather than left unsaid.
  6. Fixed written price after survey, itemised, access shown separately.
  7. Opening formed, weathered and glazed; reveal insulated and lined; hose tested before we leave. The roof is not left open overnight.

What we claim, which is very little

Two documents

A ten-year workmanship guarantee on our installation, not insurance backed. We state that plainly because they are different products and the difference matters if anything ever goes wrong. Manufacturer warranties on glass and frame are handed over at completion.

A fixed written price after survey, measured from inside the roof. If the covering comes off and the valley board underneath has gone — a Charminster classic — work stops, you see it, and the repair is priced on its own.

The firm is new and has none of them, and inventing any would be unlawful as well as dishonest. We install and replace rooflights, skylights, roof windows and lanterns; we are not general roofers and we do not build dormers. If you are in the village near Dorchester rather than the Bournemouth suburb, ring anyway — 01202 923272 — we cover it, but the answer you get will be a different one.

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272