Drainage falls that move water past a rooflight instead of round it

How falls, diverters, back gutters and outlets are set out so water travels past a rooflight kerb rather than gathering against it, and what to do when the existing fall is already wrong.

Section through a rooflight kerb on a flat roofThe unit sits on an insulated kerb standing proud of the finished roof surface. The covering is dressed up the kerb face and terminated under the frame, so water meeting the kerb runs away down the fall rather than under the unit.glazed unitinsulated kerbcovering dressed up the facedeck and insulationfallwater runs away, not under

What a kerb does to water that was minding its own business

Before the rooflight went in, rain landed on the roof and travelled in a more or less straight line to the outlet. Afterwards there is an obstruction in the middle of that route: a box, typically a foot high, entirely watertight, sitting across the path. Water arriving at its upslope face has to go somewhere, and it will do one of two things.

It will divide, travel around the box and rejoin below — or it will gather along the upslope face and sit there, because nothing is moving it sideways. The first is a rooflight in a roof that drains. The second is a dam, and the fact that the dam is perfectly waterproof makes no difference, because standing water finds the one detail that was only ever good enough for water in motion.

Designing for the first outcome is the whole of this page, and it is the thing most often missed on a retro-fitted flat skylight — the unit fitted beautifully, the roof around it left exactly as it was.

Past it, not round it

The principle in one line, and the three ways of achieving it

The principle: the roof should move water past the opening on a fall that runs the whole way to the outlet, rather than merely allowing it to find its way around an obstruction on a fall aimed somewhere else.

Method one — orientation. Set the unit so the long axis runs with the fall, not across it. A 2.5-metre pane across the direction of flow blocks 2.5 metres of roof. The same pane turned through ninety degrees blocks a metre.

Method two — diverting falls. Tapered insulation cut to form a shallow ridge above the upstand, splitting the flow deliberately and carrying each half down either side to rejoin below.

Method three — a cross fall along the face. Where a diverter is not practical, the upslope face is given its own fall along its length, so anything arriving there is moved sideways rather than parked.

Design fall and finished fall are two different numbers

UK practice for flat roofs is to aim for a minimum finished fall of 1 in 80, and to design to roughly twice that — 1 in 40 — because the roof as built is never the roof as drawn. Joists deflect. Timber is not perfectly straight. Insulation compresses where it has been walked on. A deck laid to exactly 1 in 80 is a deck that will have areas of zero fall within a few years.

The same logic applies with more force around a rooflight, because the kerb adds concentrated load at the perimeter of an opening and the opening has taken structure out of the deck. If there is one part of a flat roof where the designed fall should be generous rather than minimal, it is the two or three metres immediately upslope of an upstand.

It matters more on older stock than on new build. A 1970s extension roof in Parkstone or Hamworthy was often laid to a fall that was marginal when new, and half a century of deflection later it drains in principle and ponds in practice.

Setting out a tapered scheme around an opening

  1. Find the outlets first. Everything works backwards from where water is allowed to leave, and outlet positions are usually fixed by the building.
  2. Plot the opening onto the roof plan, to its real dimensions including the kerb thickness, which is wider than the glass and is the thing water actually meets.
  3. Decide the main direction of flow, then check what the kerb does to it. If the unit sits across the flow, look hard at rotating the unit before designing round the problem.
  4. Cut a diverter above the upstand. A tapered ridge, splitting the arriving water into two streams and taking each one clear of the corners.
  5. Check the corners downslope. Where the two streams rejoin below the unit there is a natural low point, and that is precisely where a second area of ponding gets designed in by accident.
  6. Check the finished fall everywhere, with the insulation, covering and any ballast in place — not the fall on the deck, which is not the surface the water is running on.

On a warm deck this is a drawing exercise before it is a roofing one, and a tapered scheme drawn by the insulation supplier is a normal thing to have on a job of any size.

Drainage falls that move water past a rooflight instead of round it
Ponding beside a kerb. A flat roof is never flat, and this is what a lost fall looks like.

The back gutter above the upstand

Where the roof falls towards the rooflight and the unit is wide, the upslope face needs more than a hope that water will part politely. A back gutter — in this context a formed channel above the upstand, cut into the tapered scheme and falling towards one or both sides — is the detail that takes the arriving flow and moves it along the face to where it can escape.

It is the same idea as the back gutter behind a chimney. What makes it easy to get wrong here is that the channel must work without reducing the effective height of the waterproofing up the kerb face: cutting a gutter into the insulation beside an upstand can quietly turn a 150mm upstand into a 100mm one at the point where water is deepest.

Outlets: how many, and where

Arrangement Where it suits What it does for a rooflight The failure mode to plan for
Single outlet or spout to a gutter Small extension roofs, one clear direction of fall Simple, as long as the unit is not sitting between the water and the outlet One blockage and the whole roof is a tank; the kerb is then the dam wall
Two outlets on the same edge Wider roofs, and anywhere a diverter splits the flow in two Lets each side of a diverted flow drain independently Both fed from the same gutter, so a single downpipe blockage still backs up both
Outlet plus overflow Any roof where water cannot escape over an edge if the outlet blocks The thing that stops a blocked outlet loading the kerb with standing water Set too high to be useful, or omitted because the roof has always coped
Sump outlet in a tapered scheme Warm decks with tapered insulation, larger roofs Deliberately makes the low point somewhere other than beside the unit Sump formed after the insulation is laid rather than designed into it

Overflows are the row nobody expects to have. They look like a design fault until the day they save a ceiling, and on a roof with a rooflight in it we treat one as standard: the kerb converts a blocked outlet from a puddle into a depth.

What happens after the roof: gutters, downpipes and the bit nobody checks

A drainage design stops being the roofer’s problem at the outlet, and many rooflight complaints have their cause several metres downstream. An outlet discharging into a gutter that is itself blocked, or into a downpipe shared with a main roof that delivers far more water during a heavy shower, will back up — and backing up on a flat roof means depth, and depth means the kerb is standing in it.

The check takes ten minutes: where the outlet goes, what else feeds the same pipe, and whether anything is sitting at the bottom of it. On the older stock around Poole it is common to find a flat extension draining into an interwar rainwater system never sized for the extra area, with the gulley silted up to within an inch of the top.

None of that is a reason to avoid a rooflight. It is a reason to look at the whole path before deciding a roof drains, because a kerb turns a slow drain from a nuisance into a detail under load.

What counts as ponding, and what is just a wet roof

Rain does not vanish the second it stops falling, and a flat roof will always look wet for a while. The working test is whether the water has gone within a reasonable period of a shower ending — a couple of days is the commonly quoted benchmark for a roof drying out in fair conditions. Water that is still there a week later, in the same footprint every time, is ponding.

It matters at a rooflight because the perimeter of the unit is designed to shed water, not to be submerged in it. Continuous immersion works on sealants and laps, keeps organic debris wet and in place, and turns the upslope face of the kerb into a shallow pond that freezes in winter. None of that is dramatic, and all of it shortens the life of the installation.

Drainage falls that move water past a rooflight instead of round it
The kerb is measured before anything is ordered.

Debris is a drainage problem wearing a different hat

Under the Canford Cliffs and Branksome Park pines, the roof does not block with water — it blocks with needles. The trees are protected, so the debris is permanent rather than seasonal, and pine needles are close to the perfect material for damming a shallow fall: light enough to float to the low point, fibrous enough to mat together, and slow to rot. They gather along the upslope face of a kerb and turn a functioning 1-in-80 into a standing pool. On the harbour and the spit the equivalent is gull mess and windblown sand; inland at Broadstone and Creekmoor it is moss off the north side of a roof. In each case the drainage was designed correctly and is defeated by something that arrived afterwards, which is why access for clearing belongs in the design rather than in the first ceiling stain.

Retro-fitting into a roof whose fall is already wrong

This is the awkward one, and it comes up constantly. The roof has a fall of sorts, it has been fine for twenty years because water eventually finds the edge, and now somebody wants to put a kerb across it.

There are three honest answers. If the fall is sound and only needs the unit positioned to suit it, the job is a rooflight installation. If it is marginal, the roof can often be brought up with a tapered layer as part of the same work — more cost, better roof. And if the covering is near the end of its life, the sensible sequence is to re-cover with the falls designed around the new opening and glaze into a roof that will outlast the unit.

What we will not do is fit a new unit into a roof we expect to pond against it and call it complete. That is a warranty claim with a date on it.

Before we quote, we measure the water

  1. Fall in two directions, taken across the proposed opening and at the perimeter, because roofs are rarely as flat or as consistent as they look from the ground.
  2. The route to the outlet, traced physically — where it starts, where it goes, and what it passes on the way.
  3. Evidence of existing ponding. Tide marks, silt lines, moss patterns and staining tell you where the water has been standing for years, more reliably than a level does.
  4. Outlet and overflow provision, and whether a blocked outlet has anywhere to go before the depth reaches the top of the new kerb.
  5. Debris load and access, because a roof under pines needs a drainage design that survives being neglected, not one that works when clean.
  6. Then, and only then, the unit. Size, orientation and position — chosen against the drainage, rather than the drainage being asked to cope with a decision already made.

If your flat roof already stands wet after rain and you are thinking about a rooflight or skylight, that is worth raising at the first phone call rather than at the survey. Ring 01202 923272 and describe where the water sits — it usually tells us more than the roof plan does.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272