Get a Fixed Quote

The survey-before-price method: what we measure on the roof, what the survey settles, what appears on the written quote, and the only three things that could change it.

A survey, then a price. Never the other way round

Most roof glazing quotes are produced from a phone conversation and two photographs. It is quick, it is free, and it is the reason so many people end up with an invoice that does not match the figure they agreed to. The photographs cannot show the joist spacing, the deck build-up, the state of the kerb timber under the flashing or the route a scaffold wagon would take down the road, and all four of those decide the job.

So we survey first. Somebody comes out, gets on the roof, measures it, and writes down what is actually there. Then you get one fixed price in writing, with the specification and the exposure zone named on it. It takes longer than a phone quote by about a week. It is the only way we know to give a number that still means something on the day the work starts.

What the survey settles

  1. The exposure zone, named in writing. Which of the zones your property sits in and therefore the frame coating, the fixing grade and whether self-cleaning glass is worth paying for. Sandbanks, Hamworthy and Broadstone are three different answers.
  2. The structural opening. What the deck or roof is built from, joist or rafter size and spacing, what needs trimming, and whether an engineer’s calculation is genuinely required rather than assumed.
  3. The kerb. On a replacement, whether the existing upstand is sound, square and tall enough to reuse. On a new opening, what has to be built and how tall it needs to be for your covering to terminate above the water line.
  4. The covering, and who touches it. Felt, GRP, single ply, concrete tile, natural slate or Purbeck stone slate. Each turns up a kerb differently, and single ply in particular needs someone who works in that system.
  5. Glazing and orientation. Which way the roof faces, what shades it and at what time of year, and what U-value and g-value follow from that. A north-facing unit in Upton and a south-facing one in Lilliput are not the same specification.
  6. Access and duration. Scaffold or tower, the route in for the unit, where a delivery can stand, and how many days you will have work happening on the house.
  7. Approvals. Whether the work is notifiable to Building Control, which of the three planning authorities covers you, and whether conservation area status, listed status, a National Park, a National Landscape or an Article 4 direction changes the answer.
  8. Whether we are the right firm at all. If the covering is near the end of its life, or the honest answer is a repair rather than a replacement, the survey says so.

What is on the written quote

Line on the quote What it tells you
The exposure zone Named, with the reason in a sentence. This is the line that lets you compare us against another quote properly, because it makes the specification arguable rather than take-it-or-leave-it
The unit Type, manufacturer, size, fixed or opening, glass build-up, U-value, g-value, and which pane is laminated. Overhead glazing above a room you sit in should be laminated on the inner pane
Frame finish and fixings The coating grade and the fixing grade — A4 (316) stainless in the marine zones, A2 inland — stated rather than left to be assumed
Structural and kerb work Trimming, lintels or engineered timber, and whether the kerb is being reused or built. Priced as a separate line so you can see what is glazing and what is carpentry
Access Scaffold or tower, who provides it, how long it stands, and who takes it down
Making good What we do to the internal reveal and what we do not. Plastering and decoration are named in or named out; they are never left vague
Approvals and paperwork Whether we notify Building Control, what the fee covers, and what you will be handed at the end
The price One itemised figure including VAT, with the payment stages set out, and any roof repair we have flagged shown separately so you can take it elsewhere if you prefer
The guarantee The ten-year workmanship guarantee, described as what it is, alongside the manufacturer warranties that cover the unit itself

What “fixed” means, and the only things that change it

Written in advance so it cannot be used as a surprise

Fixed means fixed. If we have measured wrong, misjudged the access or underestimated the time, that is our error and our cost. It does not reappear as a variation on your invoice.

It changes if you change the specification. A bigger unit, an opening one instead of a fixed one, different glass. We re-quote in writing before anything is ordered.

It changes if something genuinely hidden is found. Almost always soft deck or rotten kerb timber under a covering that looked intact. We stop, photograph it, show you, and price the repair separately. You decide whether we carry on.

It changes if you ask for work outside the quote. Plastering, decorating, or roof repairs we have already flagged as somebody else’s job.

Why a Poole survey is not a formality

Two roofs four miles apart can need different metal. A quote written for a property on the Sandbanks spit that does not specify a marine-grade coastal coating and A4 (316) stainless fixings has either left them out or not thought about them, and the difference shows within a few seasons as a chalked frame and rust weeping down the reveal. The same specification quoted for a bungalow in Creekmoor is an overcharge for a threat that never arrives there. This is exactly the judgement a survey exists to make, and it is why we name the zone on the paperwork rather than keeping it in our heads.

How to book one

  1. Ring 01202 923272, message us on WhatsApp, or use the enquiry form. Give us a postcode, the roof type and what the room is doing wrong.
  2. Get your exposure zone on that call. Free, immediate, and yours to keep whether or not you go further with us.
  3. We agree a survey slot. Somebody needs to be there to let us in and to talk through what you want from the room. Allow around an hour for most jobs.
  4. The quote follows in writing. Itemised, with the zone and specification named, normally within a few working days of the visit.
  5. You take as long as you like over it. No holding deposit to get a price, no pressure to sign on the day, and no figure that expires on Friday.

Before you book

Two things worth reading first. What rooflights and skylights cost explains the five things that move the figure, so nothing on the quote arrives as a surprise. Our guarantee sets out what the workmanship guarantee covers, what the manufacturer covers instead, and what would invalidate either.

And if you are not sure a rooflight is the right answer at all, say so on the call. A fair share of our survey visits end with a recommendation that costs less than the one the customer rang up expecting.

Get a fixed quote

Get a fixed quote

Tell us which way your roof faces.

We will come back with a specification, not a catalogue page. If your extension faces south we will tell you the G-value we would fit and why.

  • No pressure, no doorstep sales call
  • We handle the Building Control notification
  • 10-year workmanship guarantee on every installation
  • Installations and replacements across Poole and south Dorset

Prefer to talk it through? 01202 923272