Should I replace all the rooflights at once or one at a time?
If they were fitted at the same time and they are on the same roof, together is usually the better answer. Access is arranged once instead of three times, the glass comes from one batch so the units match, and the disruption happens on one day rather than being spread over several years. Where the units are different ages, different sizes or on separate roof areas, that logic weakens and one at a time can be entirely sensible.
The case for doing them together
| Argument | What it is worth | When it does not apply |
|---|---|---|
| One access arrangement | The biggest single saving on most jobs, and on a scaffolded roof it is decisive | Where the units are on different elevations needing separate access anyway |
| One batch of glass | Coating, tint and frame finish come from the same run, so they match | Where the existing units already differ and matching is not achievable |
| One disruption | One day of protection, dust and people on the roof rather than three | Where the rooms are used differently and can be dealt with separately |
| One survey and one order | Everything measured, specified and ordered on the same terms | Rarely. This one holds almost always |
Why the second one will not match the first
This is the argument people underestimate, and it is the one they notice afterwards. Coatings are made in runs and have a slight colour cast that varies between them, so two units bought three years apart are rarely identical when you look up at them side by side. Frame profiles change as manufacturers revise their systems, so the sightline can differ. And a unit that has spent three years on a roof has weathered slightly, so even an identical replacement reads as newer. Side by side in one ceiling, all three differences are visible.
When one at a time is right
When only one has actually failed and the others are sound, and you would rather spend on the problem than on the roof. When they are different sizes or types, so no batch advantage exists. When they are on separate roofs reached separately. And when the budget genuinely rules it out, which is a perfectly good reason and not one we will argue with. Replacing a single failed skylight is a normal piece of work and it does not oblige you to do anything else.
The access argument is the one that matters
The rule, and the exception
The rule. Where access is significant, doing them together is not a marginal preference, it is the whole economics of the job. A scaffold erected, licensed, inspected and dismantled twice is that cost twice, and it does not care how many units you took out while it was up.
The exception. Where a tower on a patio serves the roof, the access advantage is small and the decision comes back to matching and disruption. On a single-storey extension at Creekmoor reached from level ground, doing one now and one in two years is a reasonable plan. On a two-storey roof in the Old Town with a licensed scaffold over a footway, it is close to indefensible.
A middle route that works
- Survey every unit on the roof at the same visit, whatever you intend to replace, so the whole picture is measured and recorded.
- Get one written specification covering all of them, so any future order matches what goes in now.
- Replace whichever has failed, or whichever is worst, in this piece of work.
- Keep the specification and the batch details with the paperwork, so a later unit can be ordered to match rather than guessed at.
- Time the remainder to coincide with any other roof work, since the covering will eventually need attention and that is when access is already there.
Mixed types on one roof
Plenty of Poole extensions have ended up with a dome over the bathroom, a flat unit over the kitchen and a roof window in a pitched section, all fitted at different times by different people. There is no batch to preserve there, and the sensible approach is to rank them by condition and deal with them in that order, unless the access argument overrides it. What is worth doing in one go is the survey, because the three will have failed for three different reasons and you want all three reasons in one document.
Around this harbour they tend to go together
Units fitted in the same week on the same roof fail in the same season, and exposure makes that more true rather than less. Out on the spit at Sandbanks and along the harbour edge at Hamworthy and Lower Parkstone, salt, ultraviolet and driven rain work on every unit on the roof identically, so when one goes the others are usually close behind. It is the strongest argument for doing them together in the exposed zones. Inland at Broadstone, Ferndown or Wimborne the picture is looser: shading, orientation and the fall of the roof vary more between openings, and it is genuinely common there for one unit to fail while its neighbour has years left. We will tell you which of those two situations your roof is in rather than recommending the larger job by default.
What it does to the price
We will not publish figures, but the shape of it is not a secret. Access is shared across however many units are done in the visit, so its contribution per unit falls sharply. The glazing does not: three units cost what three units cost. Preparation and setting out are quicker for the second and third than the first. What that adds up to depends entirely on how significant the access is on your roof, which is why the quotation shows access as its own line and prices each unit separately, so you can see exactly what doing one fewer would save.
How we put it to you
The survey covers every rooflight on the roof and reports on each one individually: condition, likely remaining life, and whether it needs doing now. Then one fixed written price, itemised, with the option of all or some clearly costed. If we think two of your three can wait, we will write that down. Our installation work carries a ten-year workmanship guarantee, given directly by us, which is not insurance backed. Ring 01202 923272 or send photographs of each unit to 447880284133.
Related reading
Are 1990s rooflights on Poole extensions worth replacing now?
In most cases yes, and usually not for the reason people expect. A 1990s unit that has misted is finished…
Can a leaking rooflight be resealed instead of replaced?
Sometimes, where the leak is at a gasket, a termination or a joint that can genuinely be renewed. But the…
Can a misted rooflight be repaired?
Sometimes, but not in the way most people mean. The misting itself cannot be cured, because the fault is inside…
Can a misted unit be replaced with a larger one?
Yes, and it is often worth doing while the roof is open. But be clear what you are agreeing to:…
Can a rooflight be replaced in one day?
The fitting usually is, yes. One rooflight, on a roof that can be reached, onto a kerb that turns out…
Can an old dome rooflight be swapped for flat glass?
Yes, and it is one of the replacements people are most pleased with afterwards. The work is usually straightforward, because…