Will a replacement rooflight fit the existing kerb?
Often, yes, and where the kerb is square, sound, insulated and tall enough that is the cheapest and least disruptive route: you pay for glazing rather than carpentry. But fitting and being correct are two different tests, and a noticeable share of failed rooflights across Poole failed because of the kerb rather than the glass.
So the honest answer is that a new unit will almost always fit the existing opening. Whether it should be put onto it without changing anything is the question worth asking.
Four things a kerb has to be
| Test | What we are checking | What it means if it fails |
|---|---|---|
| Square | Both diagonals within a few millimetres of each other, and the top not twisted | A rigid unit cannot bed evenly. The perimeter seal carries uneven load and fails early |
| Sound | Timber dry and firm all round, particularly at the corners and the low edge | Nothing fixes into soft timber. It is rebuilt, not packed |
| Insulated | Continuous insulation round the perimeter, tying into the deck insulation | A cold bridge, and water running down the inside of the frame every January |
| Tall enough | Height above the finished surface of the covering, measured on all four sides | Driven rain gets over the top. On this coast that is not a theoretical risk |
A kerb that passes all four is reused. A kerb that fails one is usually correctable without touching the rest of the roof. A kerb that fails three is the reason the last unit did not last.
Measuring it properly
- Both widths and both heights, taken at the top of the upstand where the unit actually sits, not down at deck level.
- Both diagonals, which is the only quick way to know whether the opening is square.
- Upstand height above the finished covering on each of the four sides separately, because flat roofs are not flat and one corner is generally lower.
- A straight edge across the top in both directions, to find a twist that a tape will not show.
- Whether the covering is dressed up and over the kerb, or merely sealed against it, which is the difference between a detail and a hope.
- A look at the perimeter from inside, for insulation, for staining and for the daylight you should not be able to see.
Internal, external, structural: three numbers for one opening
This is where a replacement most often goes wrong on paper. Manufacturers quote to different conventions: some to the external frame dimension, some to the internal daylight opening, some to the kerb size the product is designed to sit over. Those can differ by well over 100mm on the same product.
We quote against the measured kerb and state on the order which convention has been used. If a supplier will not say which dimension their figure refers to, that is the thing to press on rather than the price.
Timber kerbs and proprietary kerbs
Older Poole extensions almost always have a site-formed timber upstand, framed from whatever the joists allowed and clad with the covering. Newer work frequently uses a proprietary insulated kerb, made to a size and designed to receive a particular product. Swapping between the two is entirely possible in either direction, and it is worth knowing which you have, because a proprietary kerb usually means the product it was made for still has a documented size and a straightforward successor.
When we correct rather than reuse
The rule, and the exception
The rule. If the kerb is square, sound, insulated and tall enough for the exposure, we swap like for like. You pay for glazing rather than carpentry, the covering is barely disturbed and the job is a day.
The exception. Where the kerb is why the unit failed, we say so, give you the measurement that makes it true, and price the correction as a separate line you are free to decline. What we will not do is fit a new skylight onto a kerb we have just told you is the fault and then guarantee the result. A ten-year workmanship guarantee covers our work; it cannot be stretched over somebody else’s 1998 upstand.
What correcting it actually involves
Less than people fear, in most cases. Building an upstand up in height, squaring it with a new top frame, or wrapping it in insulation are all day-work items that happen while the roof is already open. What genuinely extends the job is a soft deck found underneath, which is why we would rather cut a small inspection opening at survey than discover it on the day. Where the covering itself is near the end of its life, the sensible answer is often to do both together so the roof is opened once.
Upstand height on a Poole roof
The same kerb is adequate in one part of the service area and a defect in another. Driven rain arriving with the prevailing south-westerly off Poole Harbour goes up an upstand as readily as it falls on a roof, and on the sand spit at Sandbanks it arrives with no land to break it. A low 1990s upstand that has behaved quietly for twenty years on the heathland edge at Creekmoor or Broadstone is doing a much harder job at the harbour mouth. We name the exposure zone your roof sits in before specifying anything, and where a low kerb is acceptable we will say that too rather than sell you carpentry you do not need.
What you get in writing
After the survey: the kerb condition recorded against those four tests with measurements attached, the size convention the order is placed to, whether the replacement is a like-for-like swap or a correction, the Building Regulations position, and one fixed price with the glazing and any carpentry as separate lines. Our installation work carries a ten-year workmanship guarantee, given directly by us and not insurance backed. To talk it through, ring 01202 923272, or send photographs of the upstand at each corner to 447880284133.
Related reading
Are 1990s rooflights on Poole extensions worth replacing now?
In most cases yes, and usually not for the reason people expect. A 1990s unit that has misted is finished…
Can a leaking rooflight be resealed instead of replaced?
Sometimes, where the leak is at a gasket, a termination or a joint that can genuinely be renewed. But the…
Can a misted rooflight be repaired?
Sometimes, but not in the way most people mean. The misting itself cannot be cured, because the fault is inside…
Can a misted unit be replaced with a larger one?
Yes, and it is often worth doing while the roof is open. But be clear what you are agreeing to:…
Can a rooflight be replaced in one day?
The fitting usually is, yes. One rooflight, on a roof that can be reached, onto a kerb that turns out…
Can an old dome rooflight be swapped for flat glass?